[1]李军. 基于价值流的胖轴精益生产分析[J]. 工业工程与管理, 2008, 13(6):128-132.
LI Jun. Optimization of sulfldation machine chief axle process applied on value stream[J]. Industrial Engineering and Management, 2008, 13(6):128-132.
[2]谢庆红, 王小彬, 潘志霄. 基于价值流图析的复杂产品装配优化研究——以G公司DM3生产装配优化为例[J]. 工业工程与管理, 2013, 18(4):117-121.
XIE Qinghong, WANG Xiaobing, PAN Zhixiao. Optimization study of complex production assembly based on value stream mapping[J]. Industrial Engineering and Management, 2013, 18(4):117-121.
[3]缪周, 徐克林, 李振飞. 基于价值流图的生产线再设计:案例研究[J]. 工业工程, 2009, 12(5):115-119.
MIAO Zhou, XU Kelin, LI Zhenfei. Production line redesign by using value flow diagram: a case study[J]. Industrial Engineering Journal, 2009, 12(5):115-119.
[4]刘晓冰, 周春柳. 基于价值流的复杂装备精益改善研究——以某机车车辆柴油机公司连杆加工为例[J]. 工业工程与管理, 2015(6):137-144.
LIU Xiaobing, ZHOU Chunliu. Research of lean improvement using value stream in complex equipment manufacturing industry[J]. Industrial Engineering and Management, 2015(6):137-144.
[5]王道平, 张学龙, 黄佳媛. 企业内部供应链中知识流的价值流图析[J]. 工业工程, 2011, 14(4):145-150.
WANG Daoping, ZHANG Xuelong, HUANG Jiayuan. Knowledge flow analysis for ignition coil production by using value stream mapping[J]. Industrial Engineering Journal, 2011, 14(4):145-150.
[6]GURUMURTHY A. Design of lean manufacturing systems using value stream mapping with simulation[J]. Journal of Manufacturing Technology Management, 2013, 22(4):444-473.
[7]JEONG K Y, PHILLIPS D T. Application of a concept development process to evaluate process layout designs using value stream mapping and simulation[J]. Journal of Industrial Engineering & Management, 2011, 4(2):206-230.
[8]刘树华,鲁建夏. 精益生产[M]. 北京: 机械工业出版社,2010.
[9]荆全忠, 杨晶. 基于价值流图的抽油杆生产线平衡优化研究[J]. 工业工程与管理, 2014, 19(5):18-23.
JING Quanzhong, YANG Jing. The balancing optimization of sucker rob production line based on value stream mapping[J]. Industrial Engineering and Management, 2014, 19(5):18-23. [10]庄薇, 陈勇, 阮幸聪,等. 基于价值流的电动工具生产线分析与改善[J]. 工业工程, 2011, 14(2):122-126.
ZHUANG Wei, CHEN Yong, RUAN Xingcong, et al. Value streambased analysis and improvement of electric powerdriven tool production line[J]. Industrial Engineering Journal, 2011, 14(2):122-126.
[11]龚立雄, 谭国, 黄敏. 基于 Flexsim 的摩托车涂装生产线仿真与优化研究[J]. 工业工程与管理, 2014(3):122126.
GONG Lixiong, TAN Guo, HUANG Min. Simulation and optimization of motorcycle coating product line based on Flexsim[J]. Industrial Engineering and Management, 2014(3):122-126.[12]XIA W, SUN J. Simulation guided value stream mapping and lean improvement: a case study of a tubular machining facility[J]. Journal of Industrial Engineering & Management, 2013, 6(2):456-476. |