[1] 周济. 智能制造——“中国制造2025”的主攻方向[J]. 中国机械工程, 2015, 26(17): 2273-2284 ZHOU Ji. Intelligent mannfacturing—Main direction of “Made in China 2025”[J]. China Mechanical Engineering, 2015, 26(17): 2273-2284 [2] CHO H, LEE S, PARK J. Time estimation method for manual assembly using MODAPTS technique in the product design stage[J]. International Journal of Production Research, 2014, 52(12): 3595-3613 [3] PARK H. A study on the applicability of PTS to establish standard time for agricultural work of Korea[J]. Journal of the Ergonomics Society of Korea, 2015, 34(2): 145-149 [4] YE Z, CUI J, ZHOU F. Man-hour estimation model based on standard operation unit for flexible manufacturing system[C]//13th Global Congress on Manufacturing and Management(GCMM 2016). France: EDP Sciences, 2017. [5] 陈友玲, 任晓杰. 基于工序相似系数的工时计算方法[J]. 计算机集成制造系统, 2014, 20(4): 866-872 CHEN Youling, REN Xiaojie. Time-quota computing method based on similarity coefficient of process[J]. Computer Integrated Manufacturing Systems, 2014, 20(4): 866-872 [6] 常建娥, 李帅, 莫易敏, 等. 基于装配相似性与灰色模型的汽车装配工时预测[J]. 工业工程, 2018, 21(3): 87-92 CHANG Jian'e, LI Shuai, MO Yimin, et al. Man-hour prediction method for automobile assembly based on assembly similarity and grey model[J]. Industrial Engineering Journal, 2018, 21(3): 87-92 [7] LIU Y, TANG W, LI X. Reliability Analysis of random fuzzy repairable series system[C]// 5th Annual Conference on Fuzzy Information and Engineering. Chennai, India: Springer-Verlag, 2010. [8] MORTAZAVI S M, KARBASIAN M, GOLI S. Evaluating MTTF of 2-out-of-3 redundant systems with common cause failure and load share based on alpha factor and capacity flow models[J]. International Journal of System Assurance Engineering and Management, 2017, 8(3): 542-552 [9] 盛天文, 陈晓慧, 易树平. 寿命型设备的预防维修策略研究[J]. 计算机集成制造系统, 2009, 15(3): 598-603 SHENG Tianwen, CHEN Xiaohui, YI Shuping. Preventive maintenance policy for life-type equipment[J]. Computer Integrated Manufacturing Systems, 2009, 15(3): 598-603 [10] 孙志礼, 王健, 印明昂, 等. 可修系统预防性维修时间的确定[J]. 东北大学学报(自然科学版), 2014, 35(1): 84-87 SUN Zhili, WANG Jian, YIN Ming'ang, et al. Determination about preventive maintenance time of therepairable system[J]. Journal of Northeastern University (Natural Science), 2014, 35(1): 84-87 [11] 张志华. 可靠性理论及工程应用[M]. 北京: 科学出版社, 2012: 90-94. [12] 成国庆, 李玲, 唐应辉. 多态退化串联可修系统的最优维修更换策略[J]. 系统工程理论与实践, 2012, 32(5): 1118-1123 CHENG Guoqing, LI Ling, TANG Yinghui. Optimal replacement policy for adeteriorating series repairable system with multi-state[J]. System Engineering - Theory & Practice, 2012, 32(5): 1118-1123 [13] 史凯龙, 陆彪, 方玲珍, 等. 产能导向的三设备混联系统预防维护决策[J]. 计算机集成制造系统, 2019, 25(11): 2813-2819 SHI Kailong, LU Biao, FANG Lingzhen, et al. Preventive maintenance decision for three-unit series-parallel system[J]. Computer Integrated Manufacturing Systems, 2019, 25(11): 2813-2819 [14] FREIHEIT T, SHPITALNI M, HU S J. Productivity of paced parallel-serial manufacturing lines with and without crossover[J]. Journal of Manufacturing Science and Engineering-Transactions of the ASME, 2004, 126(2): 361-367
|