[1] 王凌, 周刚, 许烨, 等. 混合流水线调度研究进展[J]. 化工自动化及仪表, 2011, 38(1): 1-8 WANG Ling, ZHOU Gang, XU Ye, et al. Advances in the study on hybrid flow-shop scheduling[J]. Control and Instruments in Chemical Industry, 2011, 38(1): 1-8 [2] GUPTA J N D. Two-stage, hybrid flowshop scheduling problem[J]. Journal of the Operational Research Society, 1988, 39(4): 359-364 [3] HANS E W, VAN DE VELDE S. The lot sizing and scheduling of sand casting operations[J]. International Journal of Production Research, 2011, 49(9): 2481-2499 [4] BEWOOR L A, PRAKASH V C, SAPKAL S U. Production scheduling optimization in foundry using hybrid particle swarm optimization algorithm[J]. Procedia Manufacturing, 2018, 22: 57-64 [5] COCA G, CASTRILLON O D, RUIZ S, et al. Sustainable evaluation of environmental and occupational risks scheduling flexible job shop manufacturing systems[J]. Journal of Cleaner Production, 2019, 209: 146-168 [6] WU X L, SUN Y J. A green scheduling algorithm for flexible job shop with energy-saving measures[J]. Journal of Cleaner Production, 2018, 172: 3249-3264 [7] KIM Y, WORRELL E. International comparison of CO2 emission trends in the iron and steel industry[J]. Energy Policy, 2002, 30(10): 827-838 [8] 郑军, 唐任仲. 面向砂型铸造的碳排放效率建模及评价方法[J]. 浙江大学学报(工学版), 2015, 49(1): 102-109 ZHENG Jun, TANG Renzhong. Carbon efficiency model and evaluation method for sand casting[J]. Journal of Zhejiang University (Engineering Sciences), 2015, 49(1): 102-109 [9] 尹瑞雪, 曹华军, 李洪丞, 等. 砂型铸造生产系统碳排放量化方法及应用[J]. 计算机集成制造系统, 2012, 18(5): 1071-1076 YIN Ruixue, CAO Huajun, LI Hongcheng, et al. Carbon emission quantification method of sand casting process and its application[J]. Computer Integrated Manufacturing Systems., 2012, 18(5): 1071-1076 [10] OLAYINKA O S, ABDULLAHI S A. An overview of industrial employees' exposure to noise in sundry processing and manufacturing industries in Ilorin metropolis, Nigeria[J]. Industrial Health, 2009, 47(2): 123-133 [11] LU C, GAO L, LI X, et al. A multi-objective approach to welding shop scheduling for makespan, noise pollution and energy consumption[J]. Journal of Cleaner Production, 2018, 196: 773-787 [12] LU C, GAO L, PAN Q, et al. A multi-objective cellular grey wolf optimizer for hybrid flowshop scheduling problem considering noise pollution[J]. Applied Soft Computing, 2019, 75: 728-749 [13] 陶雪飞. 陶瓷企业低碳制造系统模式及评估与建模方法[D]. 重庆: 重庆大学, 2010. TAO Xuefei. Study on low-carbon manufacturing system mode and its assessment methodology[D]. Chongqing: Chongqing University, 2010. [14] TANDON N. Noise-reducing designs of machines and structures[J]. Sadhana, 2000, 25(3): 331-339 [15] YIN L, LI X, GAO L, et al. A novel mathematical model and multi-objective method for the low-carbon flexible job shop scheduling problem[J]. Sustainable Computing:Informatics and Systems, 2017, 13: 15-30 [16] ATASHPAZ-GARGARI E, LUCAS C. Imperialist competitive algorithm: an algorithm for optimization inspired by imperialistic competition[C]//2007 IEEE congress on evolutionary computation. Singapore: IEEE, 2007: 4661-4667. [17] 雷德明, 潘子肖, 张清勇. 多目标低碳并行机调度研究[J]. 华中科技大学学报(自然科学版), 2018, 46(8): 104-109 LEI Deming, PAN Zixiao, ZHANG Qingyong. Researches on multi-objective low carbon parallel machines scheduling[J]. Journal of Huazhong University of Science and Technology (Natural Science Edition), 2018, 46(8): 104-109 [18] 操三强, 雷德明. 一种新型约束多目标帝国竞争算法[J]. 信息与控制, 2019, 48(4): 437-444, 451 CAO Sanqiang, LEI Deming. A novel constrained multi-objective imperialist competitive algorithm[J]. Information and Control, 2019, 48(4): 437-444, 451 [19] KARIMI S, ARDALAN Z, NADERI B, et al. Scheduling flexible job-shops with transportation times: mathematical models and a hybrid imperialist competitive algorithm[J]. Applied Mathematical Modelling, 2017, 41: 667-682 [20] NOWICKI E, SMUTNICKI C. A fast taboo search algorithm for the job shop problem[J]. Management Science, 1996, 42(6): 797-813 [21] LIAO C J, TJANDRADJAJA E, CHUNG T P. An approach using particle swarm optimization and bottleneck heuristic to solve hybrid flow shop scheduling problem[J]. Applied Soft Computing, 2012, 12(6): 1755-1764 [22] BEHNAMIAN J, GHOMI S M T F. Hybrid flowshop scheduling with machine and resource-dependent processing times[J]. Applied Mathematical Modelling, 2011, 35(3): 1107-1123
|