[1] 美国项目管理协会. 项目管理知识体系指南[M]. 北京: 电子工业出版社, 2018. [2] GOLDRATT E M. Critical chain: a business novel[M]. Great Barrington, MA: North River Press, 1997. [3] 闫文周, 任格叶. 关键链的随机性及其在建筑工程项目进度中的应用[J]. 工业工程, 2014, 17(6): 111-114 YAN Wenzhou, REN Geye. The randomness of the critical chain and its application in the progress of construction project[J]. Industrial Engineering Journal, 2014, 17(6): 111-114 [4] LUIZ O R, DE SOUZA F B, ROJAS LUIZ J V, et al. Impact of critical chain project management and product portfolio management on new product development performance[J]. The Journal of Business & Industrial Marketing, 2019, 34(8): 1692-1705 [5] 刘士新, 宋健海, 唐加福. 关键链——一种项目计划与调度新方法[J]. 控制与决策, 2003, 18(5): 513-516 LIU Shixin, SONG Jianhai, TANG Jiafu. Critical chain—a new method for project planning and scheduling[J]. Control and Decision, 2003, 18(5): 513-516 [6] HERROELEN W, LEUS R. On the merits and pitfalls of critical chain scheduling[J]. Journal of Operations Management, 2001, 19(5): 559-577 [7] NEWBOLD R C. Project management in the fast lane: applying the theory of constraints[M]. Boca Raton: The St Lucie Press, 1998. [8] 褚春超. 缓冲估计与关键链项目管理[J]. 计算机集成制造系统, 2008, 14(5): 1029-1035 CHU Chunchao. Buffer sizing and critical chain project management[J]. Computer Integrated Manufacturing Systems, 2008, 14(5): 1029-1035 [9] 马力, 管在林, 何敏, 等. 基于关键链的自适应缓冲设置方法研究[J]. 华中科技大学学报 (自然科学版) , 2008, 36(11): 80-82 MA Li, GUAN Zailin, HE Min, et al. Research on the adaptive buffer sizing method based on the critical chain theory[J]. Journal of Huazhong University of Science & Technology (Natural Science Edition) , 2008, 36(11): 80-82 [10] 单汨源, 刘永, 任斌, 等. 基于不确定因素视角的关键链缓冲区研究[J]. 软科学, 2009, 23(8): 26-29 SHAN Miyuan, LIU Yong, REN Bin, et al. Research on critical chain buffer based on the perspective of uncertainties[J]. Soft Science, 2009, 23(8): 26-29 [11] LONG L D, OHSATO A. Fuzzy critical chain method for project scheduling under resource constraints and uncertainty[J]. International Journal of Project Management, 2008, 26(6): 688-698 [12] 翁东风, 李波, 韦灼彬. 基于模糊动态规划法的关键链缓冲确定新方法[J]. 工程管理学报, 2012, 26(5): 74-78 WENG Dongfeng, LI Bo, WEI Zhuobin. A new method to identify critical chain buffer based on the fuzzy dynamic programming[J]. Journal of Engineering Management, 2012, 26(5): 74-78 [13] 张俊光, 宋喜伟, 杨双. 基于熵权法的关键链项目缓冲确定方法[J]. 管理评论, 2017, 29(1): 211-219 ZHANG Junguang, SONG Xiwei, YANG Shuang. Buffer sizing of a critical chain project based on the entropy method[J]. Management Review, 2017, 29(1): 211-219 [14] TUKEL O I, EKSIOGLU S D. An investigation of buffer sizing techniques in critical chain scheduling[J]. European Journal of Operational Research, 2006, 172(2): 401-416 [15] GHODDOUSI P, ANSARI R, MAKUI A. A risk-oriented buffer allocation model based on critical chain project management[J]. KSCE Journal of Civil Engineering, 2017, 21(5): 1536-1548 [16] 黄建文, 黄敏, 廖再毅, 等. 考虑人力资源柔性的关键链资源缓冲设置[J]. 土木工程与管理学报, 2019, 36(4): 47-53 HUANG Jianwen, HUANG Min, LIAO Zaiyi, et al. Resource buffer setting method of critical chain considering human resource flexibility[J]. Journal of Civil Engineering and Management, 2019, 36(4): 47-53 [17] 王伟鑫, 葛显龙, 王旭, 等. 基于软逻辑关系的重复性项目调度工期: 费用优化研究[J]. 管理工程学报, 2017, 31(1): 201-207 WANG Weixin, GE Xianlong, WANG Xu, et al. Time-cost trade-off of repetitive project scheduling with soft logic[J]. Journal of Industrial Engineering and Engineering Management, 2017, 31(1): 201-207 [18] 黄敏镁, 罗荣桂. 柔性资源约束下的产品开发项目优化调度研究[J]. 管理工程学报, 2010, 24(4): 143-147 HUANG Minmei, LUO Ronggui. Study on flexible-resource-constrained product development project scheduling[J]. Journal of Industrial Engineering and Engineering Management, 2010, 24(4): 143-147 [19] ZHANG J, SONG X, DIAZ E. Buffer sizing of critical chain based on attribute optimization[J]. Concurrent Engineering, 2014, 22(3): 253-264 [20] FALLAH M, ASHTIANI B, ARYANEZHARD M B. Critical chain project scheduling: utilizing uncertainty for buffer sizing[J]. IJRRAS, 2010, 3(3): 280-289
|