[1]Johnson.Optimal towandthreestage production schedules with setup times included[J],Naval Res Logist Quart,1954(1):6168.
[2]Gupta J N D.Twostage Hybrid Flow shop scheduling problem[J].Journal of Operational Research Society,1988,39(4):359364.
[3]Sriskandarajah C,Sethi S P,Scheduling algorithm for flexible flow shops:Worst and average case performance[J].European Journal of Operational Research,1989,43:143160.
[4]Lee C Y,Vairaktarakis G L,Minimizing makespan in hybrid flow shops[J].Operations Research Letters,1994,16:149158.
[5]Osman I H,Potts C N.Simulated Annealing for Permutation FlowShop Scheduling[J].Omega(Oxford),1989,17(6):551557.
[6]Moccellin J V.A new heuristic method for the permutation flow shop scheduling problem[J].The Journal of the Operational Research Society,1995,46(7):883886.
[7]Logendran R,Carson S,Hanson E.Group scheduling in flexible Flow shops[J].International Journal of Production Economics,2005,95:143155.
[8]Logendran R,DeSzoeke P,Barnard F.Sequencedependent group scheduling problems in flexible flow shops[J].International Journal of Production Economics,2006,102:6686.
[9]Zandieh M,Dorri B,Khamseh A R.Robust metaheuristics for group scheduling with sequencedependent setup times in hybrid flexible flow shops[J].International Journal of advanced manufacturing technology,2009,43:78.
[10]孙吴胜.考虑后工序带有成组特征的模具电极调度策略的研究[D].广州:广东工业大学,2007. |