[1] |
ZHANG Zhengmin, GUAN Zailin, YUE Lei.
Performance Analysis of Hybrid GA Based on Lévy Flight in Flexible Job-shop Scheduling Problem
[J]. Industrial Engineering Journal, 2021, 24(4): 83-92.
|
[2] |
WANG Xiaojun, WANG Bo, JIN Minjie, YANG Chunxia, BAI Xinli.
Multi AGV Scheduling Optimization of AutoStore System Based on Improved Multi Population Genetic Algorithm
[J]. Industrial Engineering Journal, 2021, 24(4): 112-118,167.
|
[3] |
WANG Yingying, WU Liyun.
A Research on Multi-project Multi-skill Human Resource Scheduling Based on Improved NSGA-II
[J]. Industrial Engineering Journal, 2021, 24(3): 130-138.
|
[4] |
ZENG Chuangfeng, LIU Jianjun, CHEN Qingxin, MAO Ning.
A Genetic Algorithm-Iterative Greedy Algorithm for a Kind of Unrelated Parallel Machine Scheduling Problem
[J]. Industrial Engineering Journal, 2021, 24(2): 110-118.
|
[5] |
HUANG Lu, JI Yanguang.
A Bi-level Optimization Model for Logistics Distribution Center Location Problem under Customer Delay Cost
[J]. Industrial Engineering Journal, 2021, 24(2): 141-147.
|
[6] |
WANG Bingyi, ZHANG Jin.
A Multi-level Express Outlets Layout under Network Sharing and Change
[J]. Industrial Engineering Journal, 2021, 24(2): 155-165.
|
[7] |
MA Yueru, WEN Zheng, YI Dan.
Multi-objective Home-health-care Staff for the Elderly Routing Optimization Considering Elderly Satisfaction
[J]. Industrial Engineering Journal, 2021, 24(1): 74-81,103.
|
[8] |
WANG Jiuhe, GAO Hui, LIU Huan.
A Research on Shared Motorcycle Scheduling Problem Based on Genetic Algorithms
[J]. Industrial Engineering Journal, 2021, 24(1): 90-96.
|
[9] |
WANG Zhen, GUO Jianquan.
Research on Remanufacturing Closed-loop Supply Chain Considering Supply Disruption in Uncertain Environment
[J]. Industrial Engineering Journal, 2021, 24(1): 140-146.
|
[10] |
WU Bin, SONG Yan, CHENG Jing, DONG Min.
A Research on Vehicle Routing Problems with Time Windows Based on Density Peak Clustering
[J]. Industrial Engineering Journal, 2020, 23(5): 58-66,74.
|
[11] |
WANG Sulin, QIU Feier, CHEN Fan, LIU Chuankun, LU Teng, WANG Zhiyun.
A Research on Underground Logistics Node Selection Planning Based on Greedy Genetic Algorithm
[J]. Industrial Engineering Journal, 2020, 23(5): 88-95.
|
[12] |
WANG Ze, YANG Xinfeng, LIU Lanfen.
A Research on Vehicle Scheduling Optimization Considering Power Consumption
[J]. Industrial Engineering Journal, 2020, 23(4): 140-147.
|
[13] |
ZENG Chuifei, LIU Jianjun, CHEN Qingxin, MAO Ning.
A Comparative Study of the Algorithm of Assembly Job Shop Lot Streaming Scheduling
[J]. Industrial Engineering Journal, 2020, 23(4): 174-182.
|
[14] |
ZHANG Wei, LI Pengxiang, TONG Ziqiang, YUE Yimeng.
Research on Shared Bicycle Recycling Based on Distribution Prediction of Broken Vehicles and Profit and Loss Threshold Analysis
[J]. Industrial Engineering Journal, 2020, 23(3): 132-137.
|
[15] |
ZHANG Guohui, HU Yifan, SUN Jinghe.
An Improved Genetic Algorithm for Flexible Job Shop Scheduling Problem with Multiple Time Constraints
[J]. Industrial Engineering Journal, 2020, 23(2): 19-25,48.
|