[1]Lei D M, Xiong H J. Job shop scheduling with stochastic processing time through genetic algorithm[C]∥2008 International Conference on Machine Learning and Cybernetics. Kunming: Yunnan University, 2008:941-946.
[2]丁雷,王爱民,宁汝新.工时不确定条件下的车间作业调度技术[J].计算机集成制造系统,2010,16(1):98-108.
Ding Lei,Wang Aimin,Ning Ruxin. JobShop scheduling technology with uncertain processing time[J]. Computer Integrated Manufacturing Systems, 2010, 16(1):98-108.
[3]李晓峰,赵海,杜洪军,等.柔性流水作业排序问题的贪心算法求解[J].吉林大学学报(信息科学版),2009, 27(6):585-589.
Li Xiaofeng, Zhao Hai, Du Hongjun, et al. Greedy algorithm solution of flexible flow shop scheduling problem[J]. Journal of Jilin University(Information Science Edition),2009,27(6):585-589.
[4]王万良,姚明海,吴云高,等.基于遗传算法的混合Flowshop调度方法[J].系统仿真学报,2002, 14(7):863-865.
Wang Wanliang, Yao Minghai, Wu Yungao,et al.Hybrid Flowshop Scheduling Approach Based on Genetic Algorithm[J]. Journal of System Simulation, 2002, 14(7):863-865.
[5]Hong T P, Huang P Y, Horng G B. Three Algorithms for Flexible Flowshop Scheduling [J].American Journal of Applied Sciences 2007,4(11):889-896.
[6]欧微,邹逢兴,高政,等.基于多目标粒子群算法的混合流水车间调度方法研究[J].计算机工程与科学, 2009, 31(8):52-56.
Ou Wei, Zou Fengxing,Gao Zheng,et al. A Hybrid FlowShop Scheduling Approach Based on MultiObjective Particle Swarm Optimization[J].Computer Engineering & Science,2009,31(8):52-56.
[7]于晓义,孙树栋,王彦革.面向随机加工时间的车间作业调度[J].中国机械工程,2008, 19(19):2319-1314.
Yu Xiaoyi, Sun Shudong, Wang Yange. Research on Stochastic Processing Time Oriented Jobshop Scheduling[J]. China Mechanical Engineering, 2008, 19(19): 2319-1314.
[8]羌磊,肖田元,宋士吉.基于不确定作业时间的FSMP调度问题研究[J].控制与决策,2004,19(2):162-165.
Qiang Lei,Xiao Tianyuan,Song Shiji. On flexible flow shop scheduling problem with uncertain process time[J]. Control and Decision, 2004, 19(2):162-165.
[9]Wang K, Choi S H. A DecompositionBased Algorithm for Flexible Flow Shop Scheduling with Stochastic Processing Times[C]∥Proceedings of the World Congress on Engineering and Computer Science 2009 Vol II. USA: International Association of Engineers, 2009:1050-1060.
[10]Wang B, Yang Z. A particle swarm optimization algorithm for robust llowshop scheduling with fuzzy processing time[C]∥2007 IEEE International Conference on Automation and Logistics. USA:IEEE, 2007:824-828.
[11]Ullah S, Liu Q, Zhang C Y. Scheduling with uncertain processing times: Applying βrobust schedule on twomachine flowshop with constraints [C]∥2009 IEEE International Conference on Industrial Engineering and Engineering Management(IEEM).USA: IEEE, 2009:1946-1950. |