[1]Blazewicz J,Lenstra J K,Rinooy Kan A H C.Scheduling subject to resource constrains: classification and complexity[J].Discrete Applied Mathematic,1983,5(1):11-24.
[2]刘士新.项目优化调度理论与方法[M].北京:机械工业出版社,2007.
[3]Kennedy J, Eberhart R.Particle swarm optimization[C]∥Proceedings of IEEE International Conference on Neural Networks.New York:IEEE,1995:1942-1948.
[4]谢晓锋,张文俊,杨之廉.微粒群算法综述[J].控制与决策,2003,18(2):129-134.
Xie Xiaofeng, Zhang Wenjun, Yang Zhilian.Overview of particle swarm optimization[J].Control and Decision, 2003,18(2):129-134.
[5]刘军民,高岳林. 混沌粒子群优化算法[J].计算机应用,2008,28(2):322-325.
Liu Junmin,Gao Yuelin.Chaos particle swarm optimization algorithm[J].Computer Applications, 2008,28(2):322-325.
[6]Zhang Hong, Li Xiaodong, Li Heng. Particle swarm optimization based schemes for Resourceconstrained project scheduling[J].Automation in Construction,2005,14(3):393-404.
[7]Valls V, Ballestin F, Quintanilla S. A hybrid genetic algorithm for the resourceconstrained project scheduling problem[J].European Journal of Operational Research, 2008,158(2):495-508.
[8]Alcaraz J, Maroto C. A robust genetic algorithm for resource allocation in project scheduling[J].Annals of Operations Research,2001,102(1-4):83-109.[9]Hindi K S,Yang H,Fleszar K.An evolutionary algorithm for resourceconstrained project scheduling[J].IEEE Transactions on Evolutionary Computation,2002,6(5):512-518.
[10]F B Talbot.Resourceconstrained project scheduling with timeresource tradeoffs: the nonpreemptive case[J].Management Science,1982,28(10):1197-1210.
[11]王凌,刘波.微粒群优化与调度算法[M].北京:清华大学出版社,2008.
[12]李兵,蒋慰孙.混沌优化方法及其应用[J].控制理论与应用,1997,14(4):613-615.
Li Bing,Jiang Weisun.Chaos optimizati on method and its application[J].Control Theory and Applications,1997,14(4):613-615.
[13]F F Boctor.Some efficient muti-heuristic procedures for resource constrained project scheduling[J].European Journal of Operational Research,1995,49(1):3-13.
[14]Kolisch R.Serial and parallel resource constrained project scheduling methods revisited: theory and computation[J].European Journal of Operational Research 1996,90(2):320-333.
[15]Yu Gang, Qi Xiangtong. Disruption management: framework, models and applications[M].Singapore: World Scientific Publishing Co.Pte.Ltd., 2004. |