[1]Jerry Banks,John S Carson,Barry L Nelson,David M Nicol. Discrete-Event System Simulation[M].Beijing:China Machine Press,2007.
[2]刘建军,陈庆新,毛宁.基于能力验证的模具交货期可行性分析方法[J].计算机集成制造系统,2009,15(3):618-624.
Liu Jianjun, Chen Qinxin, Mao Ning. Approach to establish reliable due dates of mould based on capacity check[J]. Computer Integrated Manufacturing Systems, 2009, 15(3):618-624.
[3]陈超,陈庆新,毛宁.考虑多关键路径的随机项目进度监视模型[J].计算机集成制造系统,2008,14(11):2167-2174.
Chen Chao, Chen Qinxin, Mao Ning. Stochastic project process monitoring model with multicritical paths[J]. Computer Integrated Manufacturing Systems, 2008,14(11):2167-2174.
[4]彭杰,陈庆新,毛宁,等.嵌入随机概率模型的模具项目模板及其应用[J].模具工业,2007,33(8):1-5.
Peng Jie,Chen Qinxin,Mao Ning,et al. Application of die or mould project template embedded with stochastic probability model[J]. Die & Mould Industry, 2007,33(8):1-5.[5]Leung Y K, Choy K L,Kwong C K. A real time hybrid informationsharing and decision support system for the mould industry[J].Journal of High Technology Management Research,2010,21(1):64-77.
[6]黎文瑞,陈庆新,毛宁,等.随机生产环境下的模具制造单元资源配置[J].计算机集成制造系统,2007,13(11):2189-2194.
Li Wenrui, Chen Qinxin, Mao Ning,et al. Resource allocation of mould manufacturing cell in environment of stochastic production[J]. Computer Integrated Manufacturing Systems, 2007, 13(11):2189-2194.
[7]张毕西,谢祥添.基于BP神经网络多品种、小批量、订单式的生产交货期预测问题研究[J].价值工程,2007,26(8):11-13.
Zhang Bixi,Xie Xiangtian. Produced delivery date forecast problems studying about multiple products small lot order form basing on BP neural networks[J].Value Engineer, 2007,26(8):11-13.
[8]廖仁,陈庆新,毛宁.模具虚拟企业项目调度遗传算法研究[J] .计算机集成制造系统,2004,10(7):815-819.
Liao Ren, Chen Qinxin, Mao Ning. Genetic algorithm for resourceconstrained project scheduling[J]. Computer Integrated Manufacturing Systems, 2004, 10(7): 815-819.
[9]侯扬,范秀敏,严隽琪,等. 基于仿真的制造系统对象建模及其应用[J].计算机集成制造系统,2001,7(5):42-46.
Hou Yang,Fan Xiumin,Yan Junqi, et al. Simulation of manufacturing systems based on object modeling and its application[J]. Computer Integrated Manufacturing Systems, 2001, 7(5):42-46.
[10]Bondarev E,Muskens J,de With P.Predicting real time properties of component assemblies: ascenario simulation approach[DB/OL].[2004-09-20]. http:∥ieeexplore.ieee.org/.
[11]陈庆新,毛宁,刘建军,等.模具企业生产组织结构与项目管理原则[J].模具工业,2008,34(9):11-15.
Chen Qinxing,Mao Ning,Liu Jianjun,et al. Production organization structure and principles of project management for die & mould companies[J].Die & Mould Industry,2008,34(9):11-15. |