[1]Edwards J S. A survey of manpower planning models and their application[J]. The Journal of the Operational Research Society,1983,34(11): 1031-1040.
[2]Rao P. A dynamic programming approach to determine optimal manpower recruitment policies[J].The Journal of the Operational Research Society, 1980,41(10): 983-988.
[3]Easton F F, Rossin D F. Equivalent alternate solutions for the tour scheduling problems[J].Decision Sciences ,1999,22(5):985-1007.
[4]Bartholdi J J.A guaranteed accuracy round-off algorithm for cyclic scheduling and set covering[J]. Operations Research,1981,29(3):501-510.
[5]Azadeh A, Anvari M. Implementation of multivariate methods as decision making models for optimization of operator allocation by computer simulation in CMS[C]. Proceedings of SCSC06. Canada:Calgary, 2006.
[6]Antonella Certa, Mario Enea.Multi-objective human resources allocation in R&D projects planning[J]. International Journal of Production Research.2009,47(13):3503-3523.
[7]Cai X,Li K N.A genetic algorithm for scheduling staff of mixed skills under multi-criteria[J].European Journal of Operation Research,2000,125(2):359-369.
[8]Li Yong-jian,Chen Jian,Cai Xiao-qiang.Optimal manpower planning decision with single employee type considering minimal employment period constrant[J]. Asia-Pacific Journal of Operational Research,2010,27(3):411-436.
[9]Askin R G, Huang Y. Employee training and assignment for facility reconfiguration[C]. USA:Council of Industrial Engineering,1997:426-431.
[10]Bhaskar K, Srinivasan G. Static and dynamic operator allocation problems in cellular manufacturing systems[J].International Journal of Production Research, 1997, 35(12), 3467-3481.
[11]Cesani V I, Steudel H J. A study of labor assignment flexibility in cellular manufacturing systems[J]. Computers & Industrial Engineering,2005,48(3):571-591.
[12]Gert Zulcha,Sven Rottinger.Approach for personnel development planning based on the technology calendar concept[J]. International Journal of Production Economics,2007,105(1):273-281.
[13]Sohoni M G, Johnson E L, Bailey T G. Long-range reserve crew manpower planning [J].Management Science, 2004,50(6):724-739.
[14]Bhatnagar R, Saddikutti V, Rajgopalan A. Contingent manpower planning in a high clock speed industry[J]. International Journal of Production Research, 2007,45(9):2051-2072.
[15]Tang Q, Wilson G R, Perevalov E. An approximation manpower planning model for after-sales field service support[J]. Computers & Operations Research, 2008,35(11):3479-3488. |