[1]张红芳, 孙树栋, 窦德明, 等. 基于BOM 的组合件生产周期统[J]. 中国制造业信息化, 2008, 37(13):9-12.
Zhang Hong-fang, Sun Shu-dong, Dou De-ming, et al. The statistical module of subassembly product cycle time based on bom[J]. Manufacture Information Engineering of China, 2008,37(13): 9-12.
[2]罗志清, 王润孝, 骞爱荣. 模具产品制造成本与生产周期估计模型研究[J]. 计算机集成制造系统,2005,11(12):1659-1662.
Luo Zhi-qing, Wang Run-xiao, Qian Ai-rong. Research on estimation model of die manufacturing cost & production cycle[J], Computer Integrated Manufacturing Systems,2005,11(12):1659-1662.
[3]Backus P, Janakiram M, Mowzoon S, et al. Factory cycle-time prediction with a data-mining approach[J]. IEEE Transactions on Semiconductor Manufacturing, 2006, 19(2):252-258.
[4]Wood J C. Cost and cycle time performance of fabs based on integrated single-wafer processing[J].IEEE Transactions on Semiconductor Manufacturing,1997,10(1):98-111.
[5]Kim Y D, Kim J U, Lim S K, et al. Due-date based scheduling and control policies in a multiproduct semiconductor wafer fabrication facility[J]. IEEE Transactions on Semiconductor Manufacturing, 1998, 11(1):155-164.
[6]Chuang S H, Huang H W. Cycle time estimation for wafer fab with engineering lots[J]. IIE Transactions,2002,34(5):105-118.
[7]Gordon V, Proth J, Chu C. A survey of the state-of-the-art of common due date assignment and scheduling research[J]. European Journal of Operational Research,2002,139(1):1-25.
[8]De P, Ghosh J B, Wells C E. Optimal due-date assignment and sequencing[J]. European Journal of Operational Research,1992,57(3):323-331.
[9]朱海平, 刘繁茂, 刘琼, 等. 基于车间实时状态的订单完工周期预测方法[J]. 中国机械工程, 2009, 20(3):300-304.
Zhu Hai-ping, Liu Fan-mao, Liu Qiong, et al. A predictive method for order due date based on real-time state of workshop[J], China Mechanical Engineering, 2009, 20(3): 300-304.
[10]Shanthikumar J G, Shengwei Ding, Zhang M T. Queueing theory for semiconductor manufacturing systems: a survey and open problems queueing theory for semiconductor manufacturing[J].IEEE Transactions on Semiconductor Manufacturing,2007,4(4):513-522.
[11]熊中楷. ELSP中上界常数存在性定理及其对有约束的生产周期的影响[J]. 系统工程与电子技术,1997,19(10):43-44.
Xiong Zhong-kai. The effect of restricting cycle times in the ELSP[J]. Systems Engineering and Electronics,1997,19(10):43-44.
[12]Pawlak Z, Rough sets. International Journal of Information and Computer Sciences[J]. 1982,11(5):145-172.
[13]Pawlak Z. Rough classification[J]. International Journal of Man-Machine Studies,1984, 20(5):469-483.
[14]Lingras P, West C. Interval set clustering of web user with rough k-means[J]. Journal of Intelligent Information Systems, 2004, 23(1):5-16.
[15]Chen Min, Miao Duoqian. Interval set clustering[J]. Expert Systems with Applications, 2011,38(4):2923-2932. |