[1]达庆利,黄祖庆,张钦. 逆向物流系统结构研究的现状及展望[J]. 中国管理科学,2004,12(1):131-138.
Da Qing-li, Huang Zu-qin, Zhang Qin. Current and future studies on structure of the reverse logistics system: a review[J].Chinese Journal of Management Science, 2004, 12(1): 131-138.
[2]孙浩,达庆利. 制造/再制造集成物流网络设施选址问题研究[J]. 计算机集成制造系统, 2009, 15(2):362-368.
Sun Hao, Da Qing-li. Facility-location problem for an integrated manufacturing/remanufacturing logistics network[J]. Computer Integrated Manufacturing Systems, 2009,15(2):362-368.
[3]Guide V D R, Harrison T P, Van Wassenhove L N. The challenge of closed-loop supply chain[J ] . Interface, 2003 , 33(6):3-6.
[4]Guide V D R, Van Wassenhove L N. Closedloop chains: practice and potential [J ] . Interface, 2003,33(6):1-2.
[5]Savaskan R C, Bhattacharya S, Wassenhove L N V. Closed-loop supply chain models with product remanufacturing[J]. Management Science, 2004, 50(2):239-252.
[6]黄祖庆,易荣华,达庆利.第三方负责回收的再制造闭环供应链决策结构的效率分析[J]. 中国管理科学, 2008,16(3):73-77.
Huang Zu-qing, Yi Rong-hua, Da Qing-li. Study on the efficiency of the closed-loop supply chains with remanufacturing based on third-party collecting[J]. Chinese Journal of Management Science, 2008,16(3):73-77.
[7]Savaskan R C, Wassenhove V L N. Reverse channel design:the case of competing retailers[J].Management Science,2006,52(1):1-14.
[8]张克勇,周国华.零售商竞争环境下闭环供应链的协调问题研究[J]. 技术经济, 2008,27(10):114-118.
Zhang Ke-yong, Zhou Guo-hua. Research on coordination of closed-loop supply chain with retailer competition[J]. Technology Economics, 2008,27(10):114-118.
[9]Samar K, Huafan M. Joint procurement and production decisions in remanufacturing under quality and demand uncertainty[J].International Journal of Production Economics,2009,120(1):5-17.
[10]Robotis A,Shantanu B, Luk N, et al. The effect of remanufacturing on procurement decisions for resellers in secondary markets[J]. European Journal of Operational Research, 2005,163(3):688-705.
[11]晏妮娜,黄小原.基于第3方逆向物流的闭环供应链模型及应用[J]. 管理科学学报, 2008, 11(4):83-93.
Yan Ni-na, Huang Xiao-yuan. Models of closed-loop supply chain with third-party reverse logistics and their applications[J]. Journal of Management Sciences in China, 2008, 11(4):83-93.
[12]晏妮娜,强伟,黄小原.基于废钢回收的闭环供应链模型及协调研究[J]. 管理工程学报, 2009, 23(1):158-162.
Yan Ni-na, Qiang Wei, Huang Xiao-yuan. Research on closed-loop supply chain models and coordination based on scrap steel recycling[J]. Journal of Industrial Engineering/Engineering Management, 2009, 23(1):158-162
[13]Zhang Fuan,Da Qing-li. Decision model for closed loop supply chain with uncertain demand and price-dependent returns[J].Journal of Southeast University:English Edition, 2010, 26(4):638-641.
[14]He Yong, Zhao Xuan, Zhao Lin-du, et al. Coordinating a supply chain with effort and price dependent stochastic demand[J]. Applied Mathematical Modelling,2009, 33 (6) :2777-2790.
[15]Li Y. Supply chain modeling: pricing, contracts and coordination[D]. The Chinese University of Hong Kong, 2002. |