[1]张晨,邹云.基于可靠性的设备经济寿命与预防性维修周期的研究[D]. 南京: 南京理工大学, 2006.
Zhang Chen, Zhou Yun. The research of economical life and predictive maintenance period of equipment based on reliability [D]. Nanjing: Nanjing University of Science and Technology, 2006.
[2]Pham Hoang, Wang Hong-zhou. Imperfect maintenance[J]. European Journal of Operational Research, 1996, 94(3): 425-438.
[3]周晓军, 奚立峰, 李杰.一种基于可靠性的设备顺序预防性维护模型[J]. 上海交通大学学报, 2005,39(12): 2044-2047.
Zhou Xiao-jun, Xi Li-feng, Lee Jay. A reliability-based sequential preventive maintenance Model[J]. Journal of Shanghai Jiao Tong University, 2005, 39(12): 2044-2047.
[4]Malik M A K. Reliable preventive maintenance scheduling[J]. AIIE Transaction, 1979,11(3): 221-228.
[5]Xie L Y. Equivalent life distribution and fatigue failure probability prediction[J]. International Journal of Pressure Vessels and Piping, 1999, 76(4):267-273.
[6]Chan J K, Shaw L. Modeling repairable systems with failure rates that depend on age and maintenance[J]. IEEE Transactions on Reliability, 1993, 42(4): 566-571.
[7]任家君, 孔繁森. 可修复系统预防性维修策略的仿真与优化研究[D]. 长春: 吉林大学, 2009.
Ren Jia-jun, Kong Fan-sen. Simulation and optimization of preventive maintenance policy research for repairable system[D].Changchun: Jilin University, 2009.
[8]Su Chao-ton, Wu Sung-chi, Chang Cheng-chang. Multiaction maintenance subject to action-dependent risk and stochastic failure[J]. European Journal of Operational Research,2000,125(1):133-148.
[9]Frenk H, Dekker R, Kleijn M. A unified treatment of single component replacement models[J]. Mathematical Methods of Operation Research.1997,45(3):437-454.
[10]李凯扬, 陈本炎. 大修与新型更新组合优化的蒙特卡罗模拟研究[J].计算机集成制造系统,2007, 13(6):1148-1152.
Li Kai-yang, Chen Ben-yan. Monte Carlo simulation for combinatorial optimization of risk-based overhauling and improved replacement[J]. Computer Integrated Manufacturing Systems, 2007, 13(6): 1148-1152.
[11]韩帮军, 范秀敏, 马登哲,等. 用遗传算法优化制造设备的预防性维修周期模型[J]. 计算机集成制造系统—CIMS, 2003, 9(3): 206-209.
Han Bang-jun, Fan Xiu-min, Ma Deng-zhe, et al. Optimization of equipment preventive maintenance cycle in production system based on genetic algorithm[J]. Computer Integrated Manufacturing Systems, 2003, 9(3):206-209.
[12]Lapa C M F,Pereira C M N A, De Barros M P. A model for preventive maintenance planning by genetic algorithms based in cost and reliability[J]. Reliability Engineering and System Safety, 2006,91(2):233-240.
[13]谢里阳, 何雪浤, 李佳. 机电系统可靠性与安全性设计[M]. 哈尔滨: 哈尔滨工业大学出版社, 2006.
[14]薛定宇, 陈阳. 高等应用数学问题的MATLAB求解[M].2版.北京: 清华大学出版社, 2008. |