Jia Guo-zhu, Kong Ji-li. System Design of Batch Processing Modes in Processing-Assembly Enterprise with Transit Time Considered[J]. Industrial Engineering Journal , 2013, 16(2): 104-111.
[1]徐洪江,唐晓光,蔡启明,等.“多品种、小批量”企业生产问题初探[J].工业工程与管理,2004,14(4):118-121.
Xu Hong-jiang, Tang Xiao-guang, Cai Qi-ming, et al. Analysis of the problems in multitype & small batch production [J]. Industrial Engineering and Management,2004,14(4):118121.
[2]Evans,James R. Applied productionand operations management[M]. New York:West Publishing Company, St. Paul, MN, 1993.
[3]Mahdavi I.Genetic algorithm approach for solving a cell formation problem in cellular manufacturing [J]. Expert Systems with Applications,2009,36(3): 6598-6604.
[4]Tariq A,Hussain Iftikhar, Ghafoor Abdul.A hybrid genetic algorithm for machine-part grouping[J]. Computers & Industrial Engineering,2009,56(1): 347-356.[5]Chu C H.Manufacturing cell formation by competitive learning. International Journal of Production Research, 1993,31 (4): 829-843.
[6] Upton,David M. Flexibility as process mobility: The management of plant capabilities for quick response manufacturing [J]. Journal of Operations Management, 1995,12(3): 205-224.
[7]Keith Lockyer. Production Management [M]. London:Pitman Books Limited, 1983.
[8]李海婴.多品种流水型生产条件下加工周期的计算[J] 武汉工学院学报,1989,11(2):55-65.
Li Hai-ying. Calculation of production period in diversified parts flow production [J]. Journal of Wuhan Institute of Technology,1989,11(2):55-65.
[9]张毕西,关迎莹,宋静.考虑学习率的人工作业系统批量加工模式优化[J]系统工程理论与实践,2010,30(4):622-627.
Zhang Bi-xi, Guan Ying-ying, Song Jing. Optimization of batches processing system considering modes for manual operating learning rate [J]. Systems Engineering-theory & Practice,2010,30(4):622-627.
[10]尹兆涛,李铁克.考虑交货期和等待时间受限的HFS调度问题的混合算法[J].工业工程,2009,12(1):79-83.
Yin Zhao-tao, Li Tie-ke. Hybrid algorithms for hybrid flowshop scheduling considering due dates and limited wating times [J]. Industrial Engineering Journal,2009,12(1):79-83.
[11]孔继利.考虑运输时间的生产过程时间组织问题研究[J].物流工程与管理,2010,32(4):68-70.
Kong Ji-li. Research on time organization of the production process based on transportation time [J]. Logistics Engineering and Management,2010,32(4):68-70.
[12]陈庆宏,温渤.排队论在生产过程时间组织中的应用[J].北方经贸,2003(11):92-93.
Chen Qing-hong, Wen Bo. The application of queuing theory in time organization of the production procedure [J]. Northern Economy and Trade,2003(11):92-93.
[13]周峰,沈月静,刘桂玲.加工装配型生产过程时间组织与工序优化研究[J].武汉科技大学学报:自然科学版,2006,29(6):620-623.
Zhou Feng,Shen Yue-jing, Liu Gui-ling. Time organization and process optimization in processing-assembly process [J]. Journal of Wuhan University of Science and Technology:Natural Science Edition,2006,29(6):620-623.
[14]陈庭贵,肖人彬.产品开发的多输入多输出活动重叠模型研究[J].计算机集成制造系统,2008,14(2):255-261.
Chen Ting-gui, Xiao Ren-bin. Activity overlapping model with multiple IO in product development [J]. Computer Integrated Manufacturing Systems,2008, 14(2):255-261.
[15]Hilmola O P. Transfer batch sizes and the financial performance of manufacturingTheory of Constraints perspective [J]. International Journal of Manufacturing Technology and Management, 2004, 6:125-136.
[16]孔继利.企业物流管理[M].北京: 北京大学出版社,2012:135.
[17]董雅丽,杜漪.现代企业物流管理:第2版[M].兰州:兰州大学出版社,2005:193.
[18]《运筹学》教材编写组.运筹学:第3版[M].北京:清华大学出版社,2005:123.