[1]Goldratt E M. Critical Chain[M]. New York: The North River Press, 1997.
[2]Debels D, De Reyck B, Leus R, et al. A hybrid scatter search/electromagnetism metaheuristic for the resourceconstrained project scheduling problem[J]. European Journal of Operational Research, 2006, 169(3): 638-653.[3]Debels D, Vanhoucke M. A decompositionbased genetic algorithm for the resourceconstrained projectscheduling problem[J]. Operations Research, 2007, 55(3): 457-469.
[4]Goncalves J F, Mendes J J M, Resende M G C. A genetic algorithm for the resource constrained multiproject scheduling problem[J]. European Journal of Operational Research, 2008, 189(3): 1171-1190.
[5]Ballestin F, Valls V, Quintanilla S. Preemption in resourceconstrained project scheduling[J]. European Journal of Operational Research, 2008, 189(3): 1136-1152.
[6]Ranjbar M, Dereyck B, Kianfar F. A hybrid scatter search for the discrete time/resource tradeoff problem in project scheduling[J]. European Journal of Operational Research, 2009, 193(1): 35-48.
[7]林晶晶,周国华,杨琴. 考虑资源可替代性的关键链调度方法研究[J].管理学报, 2010,7(8):1233-1236.
Lin jingjing,Zhou Guohua,Yang Qin.Study on critical chain scheduling considering resource substitutability[J].Chinese Journal of Management,2010,7(8):1233-1236.
[8]Volgenant A, Duin C W. Improved polynomial algorithms for robust bottleneck problems with interval data[J]. Computers & Operations Research, 2010, 37(3):909-915.
[9]Betterton C E, Cox III J F. Espoused drumbufferrope flow control in serial lines: A comparative study of simulation models[J]. International Journal of Production Economics, 2009, 1 (1): 66-79.
[10]Chen ChunLung, Chen ChuenLung. A bottleneckbased heuristic for minimizing makespan in a flexible flow line with unrelated parallel machines[J]. Computers & Operations Research, 2009, 36(2): 3073-3081.
[11]杨琴,周国华,林晶晶,等. 应急事件中瓶颈环节的实时优化调度[J]. 系统工程,2010,28(7):74-78.
〖DW〗Yang Qin,Zhou Guohua,Lin Jingjing,et al.realtime optimized scheduling of the bottleneck in emergency[J].Systems Engineering,2010,28(7):74-78.
[12]杨琴,周国华,于玮.基于约束理论的汽车4S店维修服务系统动态调度[J].中国管理科学,2011,19(3):88-93.
Yang Qin,Zhou Guohua,Yu Wei.study on the dynamic scheduling problem of 4S auto dealership maintence service system based on theory of constraint[J].Chinese Journal of Management Science,2011,19(3):88-93. |