[1]Gupta J N D. Twostage hybrid flow shop scheduling problem[J]. Journal of Operational Research Society, 1988, 39(4): 359-364.
[2]Witt A. Simple heuristics for scheduling with limited intermediate storage[J]. Computers & Operations Research, 2007, 34(8): 2293-2309.
[3]Norman B A. Scheduling flowshops with finite buffers and sequencedependent setup times[J]. Computers & Industrial Engineering, 1999, 36(1): 163-177.
[4]Nowicki E. The permutation flow shop with buffers: a tabu search approach[J]. European Journal of Operational Research, 1999, 116(2):205-19.
[5]Qian B, Wang L. An effective hybrid DEbased algorithm for multiobjective flow shop scheduling with limited buffers[J]. Computer & Operations Research, 2009,36(4): 209-233.
[6]Ruiz R. The hybrid flow shop scheduling problem[J]. European Journal of Operational Research, 2010, 205(3):1-18.[7]Tang L, Xuan H. Lagrange relaxation algorithms for realtime hybrid flow shop scheduling with finite intermediate buffers[J]. Journal of the Operational Research Society, 2006, 57(2):316-324.
[8]Sawik T. An exact approach for batch scheduling in flexible flow lines with limited intermediate buffers[J]. Mathematical and Computer Modelling, 2002, 36(1):461-471.
[9]Akrami B, Karimi B. Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case[J]. Applied Mathematics and Computation, 2006, 183(2):634-645.
[10]Khosla I. The scheduling problem where multiple machines compete for a common local buffer[J]. European Journal of Operational Research, 1995, 84(3):330-342.
[11]Wardono B, Fathi Y. A tabu search algorithm for the multistage parallel machine problem with limited buffer capacities[J]. European Journal of Operational Research, 2004, 155(1):380-401.
[12]Wang X P, Tang L X. A tabu search heuristic for the hybrid flow shop scheduling with finite intermediate buffers[J]. Computers & Operations Research, 2009, 36(2):907-918.
[13]於春月, 王成恩, 曲蓉霞. 中厚热轧生产调度优化方法[J]. 自动化学报, 2010, 30(2):282-288.
Yu Chun-yue, Wang Cheng-en, Qu Rong-xia. The algorithm for the plate mill[J]. Acta Automatica Sinica, 2010, 30(2):282-288.
[14]Gupta J N D. Scheduling a twostage hybrid flow shop with parallel machines at the first stage[J]. Annals of Operations Research, 1997, 69(4):171-191.
[15]Santos D L, Hunsucker J L. Global lower bounds for flow shops with multiple processors[J]. European Journal of Operational Research, 1995, 80(3):112-120. |