[1]Uzsoy Y R. Scheduling a single batch processing machine with nonidentical job sizes[J]. International Journal of Production Research,1994,32(7):1615-1635.
[2]Damodaran P, Manjeshwar P K, Srihari K. Minimizing makespan on a batchprocessing machine with nonidentical job sizes using genetic algorithms[J]. International Journal of Production Economics, 2006, 103(2): 882-891.
[3]Chou F D, Chang P C, Wang H M. A hybrid genetic algorithm to minimize makespan for the single batch machine dynamic scheduling problem[J]. International Journal of Advanced Manufacturing Technology, 2006, 31(3/4):350-359.
[4]程八一,陈华平,王栓狮. 模糊制造系统中的不同尺寸工件单机批调度优化[J]. 计算机集成制造系统, 2008, 14(7):1323-1328.
Cheng Ba-yi, Chen Hua-ping, Wang Shuan-shi. Optimization for scheduling a single batchprocessing machine with nonidentical job sizes in fuzzy manufacturing system[J]. Computer Integrated Manufacturing Systems, 2008, 14(7):1323-1328.
[5]Melouk S, Damodaran P, Chang Ping-yu. Minimizing makespan for single machine batch processing with nonidentical job sizes using simulated annealing[J]. International Journal of Production Economics,2004,87(2):141-147.
[6]Damodaran P, Srihari K, Lam S S. Scheduling a capacitated batchprocessing machine to minimize makespan[J]. Robotics and ComputerIntegrated Manufacturing,2007,23(2):208-216.
[7]许瑞,陈华平. 含不同到达时间和尺寸的批调度优化算法[J]. 计算机集成制造系统,2011,17(9):1944-1953.
〖DW〗Xu Rui, Chen Huaping. Optimization algorithm on batch scheduling with different release time and nonidentical job sizes[J]. Computer Integrated Manufacturing Systems, 2011,17(9):1944-1953.
[8]Chang P Y, Damodaran P, Melouk S. Minimizing makespan on parallel batch processing machines[J]. International Journal of Production Research, 2004,42(19): 4211-4220.
[9]Damodaran P, Chang P Y. Heuristics to minimize makespan of parallel batch processing machines[J]. International Journal of Advanced Manufacturing Technology, 2008,37(9/10):1005-1013.
[10]Ghazvini F J, Dupont L. Minimizing mean flow times criteria on a single batch processing machine with nonidentical job sizes[J]. International Journal of Production Economics,1998, 55(3):273-280
[11]Kashan A H, Karimi B, Jenabi M. A hybrid genetic heuristic for scheduling parallel batch processing machines with arbitrary job sizes[J]. Computers & Operations Research,2008,35(4): 1084-1098.
[12]Cheng Ba-yi, Wang Qi, Yang Shan-lin, et al. An improved ant colony optimization for scheduling identical parallel batching machines with arbitrary job sizes[J]. Applied Soft Computing,2013,13(2):765-772.
[13]杜冰,陈华平,杨勃,等.聚类视角下的差异工件平行机批调度问题[J].管理科学学报,2011,14(12):27-37. |