[1]Minner S, Kleber R. Optimal control of production and remanufacturing in a simple recovery model with linear cost functions[J]. OR Spectrum, 2001,23 (1):3-24.
[2]周垂日, 梁樑, 苟清龙, 等. 考虑产品可替换的再制造产品选择决策[J]. 中国管理科学, 2008, 16(2):57-62.
Zhou Cui=ri, Liang Liang, Gou Qing=long, et al. Decision of remanufacturing product choice with product substitution[J]. Chinese Journal of Management Science, 2008,16(2): 57-62.
[3]吴鹏, 朱岩. 再制造企业的回收生产决策研究[J]. 清华大学学报:自然科学版, 2010, 50(12):1958-1964.
Wu Peng, Zhu Yan, Optimizing remanufacturing production decisions for the remanufacturer [J], Journal of Tsinghua University: Sci & Tech, 2010, 50(12):1958-1964.
[4]楼高翔, 周虹, 范体军. 考虑外包和生产能力约束的制造/再制造混合批量决策[J]. 系统管理学报, 2011, 20(5):549-555.
Lou Gao-xiang, Zhou Hong, Fan Ti-jun. Hybrid lot sizing decision of manufacturing/remanufacturing with outsourcing and production capacity constraint[J]. Journal of Systems & Management, 2011, 20(5):549-555.
[5]Inderfurth K, vander Laan E. Lead time effects and policy improvement for stochastic inventory control with remanufacturing[J]. International Journal of Production Economics, 2001, 71(1):381-390.
[6]Kleber R, Minner S, Kiesmuller G. A continuous time inventory model for a product recovery system with multiple options[J]. International Journal of Production Economics, 2002,79(2):121-141.
[7]景熠,王旭,李文川,等.面向汽车发动机的制造/再制造混合批量生产计划[J],计算机集成制造系统,2013,19(4):774-781
Jing Yi, Wang Xu, Li Wen-chuan, et al. Hybrid lot sizing production planning of manufacturing and remanufacturing to automobile engine[J]. Computer Integrated Manufacturing Systems, 2013, 19(4): 774-781.
[8]董美曾,陈伟达.模糊环境下再制造系统批量调度研究[J].工业工程与管理,2012,17(6):34-40
Dong Mei-zeng, Chen Wei-da. Scheduling with job family of the remanufacturing system in a fuzzy environment[J]. Industrial Engineering and Management, 2012, 17(6): 34-40.
[9]李聪波,李玲玲,曹华军,等.废旧零部件不确定性再制造工艺时间的模糊学习系统[J].机械工程学报,2013,49(15):137-146.
Li Cong-bo, Li Ling-ling, Cao Hua-jun, et al. Fuzzy learning system for uncertain remanufacturing process time of used components[J]. Journal of Mechanical Engineering, 2013, 49(15):137-146.
[10]Bolch G, Greiner S, de Meer H, et al. Queueing networks and Markov chains[M]. New York:Wiley, 1998.
[11]Merlo A, Sericola B, Marie R. A new stable algorithm for computing steady state measures for Markov chains[M]. Rennes, France: IRISA Publication Interne 1038, 1996.
|