[1]胡振,刘华,金维兴. PPP项目范式选择与风险分配的关系研究[J]. 土木工程学报,2011,44(9):139-146.
Hu Zhen, Liu Hua, Jin Wei-xing. Study of the relationship between PPP project model and risk allocation[J]. China Civil Engineering Journal, 2011,44(9):139-146.
[2]Bing L, Akintoye A, Edwards P,et al. The allocation of risk in PPP/PFI construction projects in the UK [J]. International Journal of Project Management, 2005,23(1):2535.
[3]宋波,徐飞. 基于多目标群决策迭代算法的PPP项目合作伙伴选择[J].系统管理学报,2011,20(6):690-695.
Song Bo, Xu Fei. Partnerselection in public-private partnership project based on an iterative algorithm for the multiobjective group decision problem[J]. Journal of Systems and Management, 2011,20(6):690-695.
[4]何涛,赵国杰. 基于随机合作博弈模型的PPP项目风险分担[J]. 系统工程,2011,29(4):88-92.
He Tao, Zhao Guo-jie. Risk allocation in public private partnerships based on stochastic cooperative game[J].Systems Engineering, 2011,29(4):88-92.
[5]孙慧,范志清,石烨. PPP模式下高速公路项目最优股权结构研究[J].管理工程学报,2011,25(1):154-157.
Sun Hui, Fan Zhi-qing, Shi Ye. Research on the optimal ownership structure of an expressway under a PPP scheme[J]. Journal of Industrial Engineering/Engineering Management, 2011,25(1):154-157.
[6]何寿奎,傅鸿源. 基于风险分摊的PPP项目投资决策与收益分配研究[J]. 建筑经济,2006(10):9-12.
He Shou-kui, Fu Hong-yuan. Research on the investment decision and revenue allocation of PPP project based on risk sharing[J]. Construction Economy, 2006(10):9-12.
[7]Ahmed M, Abdel A M. Successful delivery of public private partnerships for infrastructure development [J]. Journal of Performance of Constructed Facilities, 2007, 21(6): 918-931.
[8]朱秀丽,邱菀华. 基于实物期权的铁路地下化项目PPP模式投资决策分析[J]. 系统工程,2011,29(3):117-120.
Zhu Xiu-li, Qiu Wan-hua. Analysis of investment decision in railway underground PPP project based on real option[J]. Systems Engineering, 2011,29(3):117-120.
[9]何永健,王守清,陈炳泉. 私营资本参与基础设施PPP项目的政府激励措施[J]. 清华大学学报:自然科学版,2009,49(9):1480-1483.
He Yong-jian, Wang Shou-qing, Chen Bing-quan. Government incentives for private sector involvement in infrastructure PPP projects[J]. Journal of Tsinghua University:Science and Technology, 2009,49(9):1480-1483.
[10]吴孝灵,周晶,洪巍. 基于有效运营期的BOT项目特许权期决策模型[J].系统工程学报, 2011, 26(3): 373-378.
Wu Xiao-ling, Zhou Jing, Hong Wei. Decisionmaking model on BOT project’s concession period based on an efficient operational period[J].Journal of Systems Engineering, 2011, 26(3): 373-378.
[11]叶晓甦,杨俊萍.基于多目标规划模型的PPP项目定价方式研究[J]. 统计与决策,2012(6):74-77.
Ye Xiao-su, Yang Jun-ping. Research on the pricing of PPP project based on mult-objective programming model[J]. Statistics and Decision, 2012(6):74-77.
|