[1]Quadt D, Kuhn H. Batch scheduling of jobs with identical process times on flexible flow lines[J].International Journal of Production Economics, 2007, 105(2):385-401.
[2]Chen C L.A bottleneckbased heuristic for minimizing makespan in a flexible flow line with unrelated parallel machines[J].Computers & Operations Research, 2009, 36(11):3073-3081.
[3]Sawik T. An Exact Approach for Batch Scheduling in Flexible Flow Lines with Limited Intermediate Buffers[J].Mathematical and Computer Modeling, 2002, 36(45):461-471.
[4]Zandieh M, Fatemi Ghomi S M T, Moattar Husseini S M. An immune algorithm approach to hybrid flow shops scheduling with sequencedependent setup times [J].Applied Mathematics and Computation, 2006, 180(1):111-127.
[5]Yagmahan B, Yenisey M M. Ant colony optimization for multiobjective flowshop scheduling problem[J].Computers &Industrial Engineering, 2008, 54(3):411-420.
[6]Alexandros D C, Chrissoleon P T. Exact analysis of a twoworkstation onebuffer flow line with parallel unreliable machines [J].European Journal of Operational Research, 2009, 197(2):572-580.
[7]Scholl A, Boysen N, Fliedner M. The assembly line balancing and scheduling problem with sequencedependent setup times: problem extension, model formulation and efficient heuristics [J].OR Spectrum, 2013, 35(1): 291-320.
[8]Yagmahan B. Mixedmodel assembly line balancing using a multiobjective ant colony optimization approach [J]. Expert Systems with Applications, 2011, 38(10): 12453-12461.
[9]王凌, 周刚, 许烨,等.混合流水线调度研究进展[J].化工自动化及仪表, 2011, 38(1):1-8.
Wang Lin, Zhou Gang, Xu Ye,et al. Advances in the study on hybrid flowshop scheduling [J].Control and Instruments in Chemical Industry, 2011, 38(1):1-8.
[10]Bouabda R, Jarboui B, Eddaly M, Rebai A. A branch and bound enhanced genetic algorithm for scheduling a flowline manufacturing cell with sequence dependent family setup times[J].Computers& Operations Research, 2011, 38(1):387-393.
[11]Karimi N, Zandieh M, Karamooz H R. Biobjective group scheduling in hybrid flexible flowshop: A multiphase approach[J].Expert Systems with Applications, 2010, 37(6):4024-4032.
[12]Pezzella F, Morganti G, Ciaschett G. A genetic algorithm for the flexible Jobshop scheduling problem[J].Computers &Operations Research, 2008, 35(10):3202-3212.
[13]Boysena N, Bock S. Scheduling justintime part supply for mixedmodel assembly lines [J]. European Journal of Operational Research, 2011, 211(1): 15-25.
[14]张志英, 杨克开, 于瑾维等.改进粒子群算法的动态空间调度方法[J].哈尔滨工程大学学报, 2009, 30(12):1344-1350.
Zhang Zhi-ying, Yang Ke-kai, Yu Jin-wei,et al. Dynamic spatial scheduling approach based on improved particle swarm optimization algorithm [J]. Journal of Harbin Engineering University, 2009, 30(12):13441350.
[15]Lee K J, Lee J K, Choi S Y. A spatial scheduling system and its application to shipbuilding: DASCURVE[J].Expert Systems with Applications, 1996, 10(34):311-324.
[16]李宁.船舶制造平面分段流水线作业优化应用与研究[D].上海:上海交通大学, 2006.
Li Nin. The optimized application and research on production of panel block assemble line for shipbuilding [D]. Shanghai: Shanghai Jiao Tong University, 2006.
[17]张宇.平面分段流水线的优化及最佳效能研究[D]. 大连:大连理工大学, 2008.
Zhang Yu. Research on the Optimization of Panel Production Line and its Optimal Efficacy [D]. Dalian, Dalian University of Technology, 2008.
[18]Zhang Z Y, Li D Q. Research on noncompletely hybrid flow line scheduling of panel block in shipbuilding [J]. Computer Integrated Manufacturing Systems, 2012, 18(11): 2435-2445.
[19]Wang C S, Uzsoy R. A genetic algorithm to minimize maximum lateness on a batch processing machine[J].Computers &Operations Research, 2002, 29(12):16211640.
[20]Gajpal Y, Rajendran C, Ziegler H. An ant colony algorithm for scheduling in flowshops with sequencedependent setup times of jobs[J].The International Journal of Advanced Manufacturing Technology, 2006, 30(5-6):416-424.
[21]王书锋, 刘海成.大规模流水线调度的瓶颈分解算法研究[J].控制与决策, 2006, 21(4):425-429.
Wang Shu-feng, Liu Hai-cheng. Bottleneckbased decomposition algorithm for largescale flow shop scheduling problems [J]. Control and Decision, 2006, 21(4):425-429.
[22]轩华, 唐立新.带多处理器任务的动态混合流水线车间调度问题[J].计算机集成制造系统, 2007, 13(11):2254-2260.
Xuan Hua, Tang Li-xin. Dynamic hybrid flowshop scheduling problem with multiprocessor tasks [J].Computer Integrated Manufacturing Systems, 2007, 13(11):2254-2260. |