[1]Ye T, Han W. Determination of buffer sizes for drumbufferrope(DBR)controlled production systems[J]. International Journal of Production Research, 2008, 46(10): 2827-2844.
[2]Schragenheim E, Ronen B. Buffer management: a diagnostic tool for production control[J]. Produ ction and Inventory Management Journal, 1991,32(2):74-79.
[3]Goldratt E M. The haystack syndrome: shfting information out of data ocean[M].United States:North River Press Inc, 1990.
[4]Guide V D R. Scheduling using drumbufferrope in a remanufacturing environment[J]. Interna tional Journal of Production Research, 1996, 34(4): 1081-1091.
[5]Daniel V, Guide R.Scheduling with priority dispatching rules and drumbufferrope in a recoverable manufacturing system[J]. Interna tional Journal of Production Economics, 1997, 53(1): 101-116.
[6]Radovilsky Z D. A Quantitative approach to estimate the size of the time buffer in the theory of constraints[J]. International Journal of Production Economics, 1998, 55(1): 113119.
[7]Louw L, Page D C. Queuing network analysis approach for estimating the sizes of the time buffer in theory of constraintscontrolled production systems[J]. International Journal of Production Research, 2004, 42(6):1207-1226.
[8]Patroklos Georgiadis, Alexandra Politou. Dynamic DrumBufferRope approach for production planningand control in capacitated flowshop manufacturing systems[J]. Computers & Industrial Engineering. 2013, 65(4):689-703.
[9]李爱华,尹柳营. DBR技术中确定缓冲大小的模型[J].中国管理科学,1998,6(1):16-20.
Li Ai-hua, Yin Liu-ying.Determination of buffer size for drumbufferrope [J]. Chinese Journal of management science. 1998, 6(1): 16-20.
[10]陈伟达,林晶晶. 基于DBR的再制造系统缓冲设置模型研究[J], 科研管理, 2010,31(5):108-117.
Chen Wei-da, Lin Jing-jing.Determination of buffer size for remanufacturing system based on DBR[J].Science Research Management, 2010,31(5): 108-117
[11]陈俊,胡平,马丽丽. 基于DBR的再制造系统时间缓冲控制机制[J]. 吉林大学学报:工学版, 2009, 39(5): 1197-1201.
Chen Jun, Hu Ping, Ma Li-li. Inventory buffer and time buffer control mechanism for reman ufacturingsystem[J]. Journal of Jilin University:Engineering and Technology Edition,2009,39(5): 1197-1201.
[12]郭永辉,钱省三. 基于DBR理论的半导体晶圆厂生产作业控制[J].工业工程与管理, 2006,(5):70-75.
Guo Yong-hui, Qian Xing-san. Production control in wafer fabrication based on DBR theory[J].Industrial Engineering and Management, 2006, (5):70-75.
[13]Hoop W J, Spearman M L. Factory physics[M]. Beijing: Tsinghua University Press, 2002. |