A Project Duration Risk Analysis and Evaluation Under Multiple Influencing Factors Based on PERT
1. School of Management, Tianjin Ploytechnic University, Tianjin 300387, China; 2. Tianjin Water Engineering Construction and Transaction Center, Tianjin 300204,China
Wu Fei-fei1, Wang Xue-hai2, Cheng Tie-xin1. A Project Duration Risk Analysis and Evaluation Under Multiple Influencing Factors Based on PERT[J]. Industrial Engineering Journal .
[1]赵道致,王元明.基于PERT的项目工期风险传递机制[J].工业工程,2008,11(4):14-18.
Zhao Dao-zhi,Wang Yuan-ming.A method of project schedule risk transmission based on PERT[J].Industrial Engineering Journal,2008,11(4):14-18.
[2]Malcolm D G,Roseboom J H,Clark C E,Fazar W.Application of a technique for research and development program evaluation[J].Operations Research,1959,7(5):646-669.
[3]李平,顾新一.PERT 网络工期风险计算方法的研究[J].统计与决策,2004(5):16-17.
Li Ping,Gu Xin-yi.A method of project schedule risk calculation based on PERT[J].Statistics and Decision,2004(5):16-17.
[4]Kotiah T C T,Wallace N D.Another look at the PERT assumptions[J].Management Science,1973,20(1):44-49.
[5]Mohan S,Gopalakrishnan M,Balasubramanian H,et al.A lognormal approximation of activity duration in PERT using two time estimates[J].Journal of the Operational Research Society,2007,58(6):827-831.
[6]Hahn E D.Mixture densities for project management activity times:a robust approach to PERT[J].European Journal of Operational Research,2008,188(2):450-459.[7]Johnson D.The triangular distribution as a proxy for the beta distribution in risk analysis[J].Journal of the Royal Statistical Society,1997,46:387-398,
[8]Trietsch D,Mazmanyan L,Gevorgyan L,et al.Modeling activity times by the Parkinson distribution with a lognormal core:theory and validation[J].European Journal of Operational Research,2012, 216 (2):386-396.
[9]刘武,杜志达,刘祥瞻.PERT 网络活动时间参数估计的改进[J].统计与决策,2008(4):150-153.
Liu Wu,Du Zhi-da,Liu Xiang-zhan.The improvements of PERT network activity time parameter estimation[J].Statistics and Decision,2008(4):150-153.
[10]李阳,于海山,沈琴,等.改进的PERT项目工期估算方法[J].工业工程与管理,2007(4):38-42.
Li Yang,Yu Hai-shan,Shen Qin,et al.An estimating method for aviation project’s duration based on improved-PERT[J].Industrial Engineering and Management,2007(4):38-42.
[11]王涛,蔡建锋.改进的PERT项目工期方差的估算方法[J].工业工程与管理,2012,17(1):36-39.
Wang Tao,Cai Jian-feng.Estimating the variance of the project based on improved PERT[J].Industrial Engineering and Management,2012,17(1):36-39.
[12]Premachandra I M.An approximation of the activity duration distribution in PERT[J].Computers & Operations Research,2001,28(5):443-452.
[13]Piros A, Veres G.Fuzzy based method for project planning of the infrastructure design for the diagnostic in ITER[J].Fusion Engineering and Design,2013,88(6/7/8):1183-1186.
[14]González G E G,Hernández G O,Roldán F.Effect of network’s morphology and merge bias correction procedures on project duration mean and variance[J].Procedia - Social and Behavioral Sciences,2014,119 (19):2-11.
[15]Hashemin S S,Ghomi S M T F,Modarres M.Optimal constrained non-renewable resource allocation in PERT networks with discrete activity times[J].Scientia Iranica,2012,19 (3):841-848.
[16]胡静静.基于Crystal Ball的PERT网络计划项目工期风险分析[J].企业科技与发展,2012(1):21-23.
Hu Jing-jing.Analysis of duration risk of PERT network planning project based on Crystal Ball[J].Enterprise Science And Technology & Development,2012(1):21-23.
[17]李修华.多因素影响下的Monte Carlo进度风险分析模型[D].上海:同济大学,2007.
Li Xiu-hua.The Monte Carlo analysis model of progress under multi-factors[D].Shangha:Tongji University,2007.