[1]GOMAR J E, HAAS C T, MORTON A D P. Assignment and allocation optimization of partially multiskilled workforce[J]. Journal of Construction Engineering and Management, 2002, 128(2): 103-109.
[2]ACUA S T, JURISTO N, MORENO A M. Emphasizing human capabilities in software development[J]. Software, 2006, 23(2): 94-101.
[3]寿涌毅. 资源受限多项目调度的模型与方法[M]. 杭州: 浙江大学出版社, 2010.
[4]BRUCKER P, DREXL A, MOHRING R, et al. Resourceconstrained project scheduling: Notation, classification, models, and methods[J]. European Journal of Operational Research, 1999, 112(1): 3-41.
[5]DENISE S Y, VIN-CIUS A A, MANUEL L. Robust optimization models for project scheduling with resource availability cost[J]. Journal of Scheduling, 2007, 10(1): 67-76.
[6]HARRIS R B. Packing method for resource leveling[J]. Journal of Construction Engineering and Management, 1990, 116(2): 331-350.
[7]WIESEMANN W, KUHN D, RUSTEM B. Maximizing the net present value of a project under uncertainty[J]. European Journal of Operational Research, 2010, 202(2): 356-367.
[8]BELLENGUEZ M O, NRON E. A branch-andbound method for solving multi-skill project scheduling problem[J]. RAIRO Operation Research, 2007, 41(2): 155-170.
[9]HEIMERL C, KOLISCH R. Scheduling and staffing multiple projects with a multi-skilled workforce[J]. OR Spectrum, 2010, 32(2): 343-368.
[10]ALFARES H K, BAILEY J E. Integrated project task and manpower scheduling[J]. IIE Transactions, 1997, 29(9): 711-717.
[11]WU M, SUN S. A project scheduling and staff assignment model considering learning effect[J]. The International Journal of Advanced Manufacturing Technology, 2005, 28(11/12): 1190-1195.
[12]ATTIA E, DUQUENNE P, LELANN J. Considering skills evolutions in multiskilled workforce allocation with flexible working hours[J]. International Journal of Production Research, 2014, 52(15): 4548-4573.
[13]CORREIA I, SALDANHADAGAMA F. The impact of fixed and variable costs in a multiskill project scheduling problem: An empirical study[J]. Computers & Industrial Engineering, 2014, 72: 230-238.
[14]卢鹏宇,孙文俊,井瑞. 基于时间片段的多IT项目人力资源调度问题求解[J]. 系统工程理论与实践, 2012, 32(4): 731-737.
LU Pengyu, SUN WenJun, JING Rui. Time slice based solution for human resource scheduling problem of multiple IT projects[J]. Systems Engineering-Theory&Practice, 2012, 32(4): 731-737.
[15]LI H, WOMER K. Scheduling projects with multi-skilled personnel by a hybrid MILP/CP benders decomposition algorithm[J]. Journal of Scheduling, 2009, 12(3): 281-298.
[16]BELLENGUEZ M O. Methods to solve multi-skill project scheduling problem[J]. Journal of Operations Research, 2008, 6(1): 85-88.
[17]HARRIS R B. Precedence and arrow networking techniques for construction[M]. New York: Wiley, 1978.
[18]SALEM Hiyassat M A. Modification of minimum moment approach in resource leveling[J]. Journal of Construction Engineering and Management, 2000, 126(4): 278-284.
[19]HEGAZY T. Optimization of resource allocation and leveling using genetic algorithms[J]. Journal of Construction Engineering and Management, 1999, 125(3): 167-175.
[20]HIYASSAT M A S. Applying modified minimum moment method to multiple resource leveling[J]. Journal of Construction Engineering and Management, 2001, 127(3): 192-198.
[21]RANGEN. http://www.projectmanagement.ugent.be/?q=research/RanGen.[OL].
[22]ILOG. IBM ILOG OPL V6.3 IBM ILOG OPL Language Reference Manual[M]. Copyright International Business Machines Corporation, 1987, 2011.
(上接第107页)
[18]陈栩茜,张积家. 注意资源理论及其进展[J]. 心理学探新,2003,23(88):24-28.
CHEN Xiqian, ZHANG Jijia. Attention resource theory and progress[J].Exploration of Psychology,2003,23(88):24-28.
[19]KOK A. On the utility of P3 amplitude as a measure of processing capacity[J]. Psychophysiology,2001,38(3): 557-577.
[20]POLICH J. Updating P300: an integrative theory of P3a and P3b. Clinical neurophysiology, 2007,118(10): 2128-2148.
[21]CHAO L L, NIELSENBOHLMAN L, KNIGHT R T. Auditory eventrelated potentials dissociate early and late memory processes[J]. Electroencephalography and Clinical Neurophysiology/Evoked Potentials Section ,1995,96(2): 157-168.
[22]BRODMANN K. Vergleichende Lokalisationslehre der Grosshirnrinde in ihren Prinzipien dargestellt auf Grund des Zellebaues[M]. Leipzig: J.A. Barth; 1909.
[23]罗跃嘉. 认知神经科学教程[M]. 北京:北京大学出版社,2006.
[24]羊惠君. 实地解剖学(第2版)[M].北京:人民卫生出版社, 2011.
|