[1 ]SALVESON M. The assembly line balancing Problem[J]. Journal of Industrial Engineering, 1955, 6(3):18-25.
[2]陈心德,吴忠. 生产运营管理[M]. 北京:清华大学出版社,2005.
[3]ARMIN S, CHRISTIAN B. State-of-the-art exact and heuristic solution procedures for simple assembly line balancing[J]. European Journal of Operational Research, 2006, 168(6):666-693.
[4]BARTHOLDI J. Balancing twosided assembly lines: a case study[J]. International Journal of Production Research, 1993, 31(10):2447-2461.
[5]KIM Y. Two-sided assembly line balancing: a genetic algorithm approach[J].Production Planning & Control, 2000, 11(1):44-45.
[6]LEE T O. Two-sided assembly line balancing to maximize work relatedness and slackness[J]. Computers & Industrial Engineering, 2001, 40(3):273-292.
[7]吴尔飞, 金烨,续爱民,等. 基于改进遗传算法的双边装配线平衡[J].计算机集成制造系统,2007, 13(2):268-274.
WU Erfei, JING Ye, XU Aimin, et al. Two-sided assembly line balancing based on modified genetic algorithm[J]. Computer Integrated Manufacturing Systems, 2007, 13(2):268-274.
[8]ZCAN U.Multiple-criteria decision-making in two-sided assembly line balancing: a goal programming and a fuzzy goal programming models[J]. Computers & Operations Research, 2009, 36(6): 1955-1965.
[9]陈建行, 张其松. 蚁群算法在装配线平衡问题中的应用[J]. 计算机时代, 2008(12):20-22.
CHEN Jianhang, ZHANG Qisong. Ant colony algorithm in the application of the assembly line balancing problem[J]. Computer Era, 2008(12):20-22.
[10]杨涛, 鲁建厦, 孔令革. 具有并发操作的双边装配线平衡问题研究[J]. 浙江工业大学学报, 2011, 39(4): 440444.
YANG Tao, LU Jiansha, KONG Lingge. Study on balancing problem of two sided assembly line with concurrent operation[J]. Journal of Zhe Jiang University of Technology, 2011, 39(4): 440-444.
[11]宋林, 张则强, 程文明,等.随机型双边装配线平衡问题的一种启发式算法[J]. 工业工程, 2011, 14(4):129-134.
SONG Lin,ZHANG Zeqiang, CHEN Wenming, et al. Heuristic for twosided stochastic assembly line balancing[J]. Industrial Engineering Journal, 2011, 14(4):129-134.
[12]于兆勤. 混合型装配线平衡问题的不确定性仿真研究[J]. 中国机械工程, 2008, 19(11): 1297-1302.YU Zhaoqin. Simulation of uncertainty for mixedmodel assembly line balancing problem[J].China Mechanical Engineering, 2008, 19(11): 1297-1302.
[13]张则强, 余庆良, 胡俊逸,等. 随机混流装配线平衡问题的一种混合粒子群算法[J]. 机械设计与研究, 2013, 29(2): 60-63.
ZHANG Zeqiang, YU Qingliang, HU Junyi, et al. Hybrid particle swarm optimization algorithm for balancing problem of stochastic mixed-model assembly line[J].Machine Design and Research, 2013, 29(2): 60-63.
[14]黄卫平, 张健, 周支立. 随机型混合模式装配线平衡问题的集束搜索算法[J]. 运筹与管理, 2010, 19(6): 20-26.HUANG Weiping, ZHANG Jian, ZHOU Zhili. A beam search approach to stochastic mixedmodel assembly line balancing problem[J]. Operations Research and Management Science, 2010, 19(6): 20-26.
[15]吴尔飞. 双边装配线平衡技术的研究[D]. 上海:2009, 上海交通大学.WU Erfei. Research on balancing twosided assembly line[D]. shanghai: Shanghai Jiao Tong University,2009.
[16]施於人. eMPlant仿真技术教程[M]. 北京:科学出版社, 2009.
[17]肖田元,范文慧. 系统仿真导论[M]. 北京:清华大学出版社, 2010. |