[1]张惠煜,康伟成,毛宁,等. 面向定制生产系统的缓冲区优化配置方法[J]. 工业工程,2014,17(5): 85-92.
ZHANG Huiyu,KANG Weicheng,MAO Ning,et al.Buffer optimization configuration method for customized manufacturing system[J].Industrial Engineering Journal,2014,17(5): 85-92.
[2]徐云天,张力菠. 考虑系统波动因素的DBR瓶颈缓冲区容量设置[J]. 工业工程,2014,17(6): 24-29.
XU Yuntian,ZHANG Libo. Determination of constraint buffer size for drumbufferrope considering system′s fluctuation factor[J].Industrial Engineering Journal,2014,17(6): 24-29.[3]SINGH A,SMITTH J M. Buffer allocation for an integer nonlinear network design problem[J]. Computers and Operations Research,1997, 24(5):453-472.
[4]HASKOSE A,KINGSMAN B G, WORTHINGTON D. Performance analysis of maketoorder manufacturing systems under different workload control regimes[J].International Journal of Production Economics,2004,90(2):169-186.
[5]康伟成,俞爱林,黎展滔. 基于仿真的多级流水车间缓冲区配置优化[J].机电工程技术,2013,42(11): 1-5.
KANG Weicheng,YU Ailin,LI Zhantao. Simulationbased buffer allocation optimization for multistage flowshop[J]. Mechanical and Electrical Engineering Technology,2013,42(11): 1-5.
[6]李翔,陈庆新,毛宁,等. 多级流水线车间缓存设置参数仿真优化[J]. 模具工业,2012,38(7): 1-6.
LI Xiang, CHEN Qingxin, MAO Ning,et al.Simulation optimization of buffer allocation parameters in multistage flow shop[J]. Mould Industry,2012,38(7): 1-6.
[7]李永先,胡祥培,熊英. 物流系统仿真研究综述[J]. 系统仿真学报,2007,19(7): 1411-1416.
LI Yongxian, HU Xiangpei, XIONG Ying. Overview on logistics system simulation[J]. Journal of System Simulation,2007,19(7): 1411-1416.
[8]杨堃. 基于eMPlant的生产物流系统仿真与应用[J]. 工业工程,2010,13(5): 95-100.
YANG Kun. eMPlantBased simulation and optimization of steel tube production process:a case study[J]. Industrial Engineering Journal,2010,13(5): 95-100.
[9]张远春,范秀敏,驹田邦久. 基于仿真优化的多种类型AGV数量配置优化方法[J]. 中国机械工程, 2011,22(14): 1680-1685.
ZHANG Yuanchun,FAN Xiumin,KOMADA Kunihisa. Multi types AGVs quantity configuration optimization based on simulation optimization[J]. China Mechanical Engineering,2011,22(14): 1680-1685.
[10]王国新,宁汝新,王爱民,等. 仿真优化在制造系统中的应用现状及发展趋势[J]. 系统仿真学报,2008,20(1): 1-6.
WANG Guoxin, NING Ruxin, WANG Aimin,et al. Present application situation and trends of simulation optimization in manufacturing system[J]. Journal of System Simulation,2008,20(1): 1-6.
[11]王国新,宁汝新,王爱民. 基于仿真的生产调度优化技术研究[J]. 计算机集成制造系统,2007,13(7): 1419-1427.
WANG Guoxin, NING Ruxin, WANG Aimin. Production optimal scheduling technology based on simulation[J]. Computer Integrated Manufacturing Systems,2007,13(7): 1419-1427.