[1]CLARK A J, SCARF H. Optimal policies for a multiechelon inventory problem[J]. Management Science, 1960, 6(4): 475-490.
[2]FEDERGRUEN A, ZIPKIN P. Computational issues in an infinite horizon, multiechelon inventory model[J].Operations Research, 1984, 32(4):818-836.
[3]CHEN F, ZHENG Y S. Lower bounds for multiechelon stochastic inventory systems[J]. Management Science, 1994, 40(11):1426-1443.
[4]CHEN F, ZHENG Y S. Evaluating echelon stock (R, nQ) policies in serial production/inventory systems with stochastic demand[J]. Management Science, 1994, 40(10): 1262-1275.
[5]CHEN F, ZHENG Y S. Onewarehouse multiretailer systems with centralized stock information[J]. Operations Research, 1997, 45(2):275-287.
[6]夏海洋, 黄培清. 随机需求下提前期可控的生产库存联合优化模型[J]. 控制与决策, 2008, 23(6): 631-636.
XIA Haiyang, HUANG Peiqing. Integrated productioninventory model with stochastic demand and controllable lead time[J]. Control and Decision, 2008, 06:631-636
[7]HOUTUM G J V, INDERFURTH K, ZIJM W H M. Materials coordination in stochastic multiechelon systems[J]. European Journal of Operational Research, 1996, 95(1):1-23.
[8]ANGELUS A. A multiechelon inventory problem with secondary market sales[J]. Management Science, 2011, 57(12):2145-2162.
[9]GOEL A, GUTIERREZ G J. Multiechelon procurement and distribution policies for traded commodities[J]. Management Science, 2011, 57(12): 2228-2244.
[10]PAL B, SANA S S, CHAUDHURI K. A three layer multi-item production-inventory model for multiple suppliers and retailers[J]. Economic Modelling, 2012, 29(6): 2704-2710.
[11]GHIAMI Y, WILLIAMS T. A two-echelon production-inventory model for deteriorating items with multiple buyers[J]. International Journal of Production Economics, 2015, 159: 233-240.
[12]戢守峰,蓝海燕,唐金环,等. 碳限额与碳交易约束下制造商生产库存控制策略[J]. 运筹与管理,2015(3):51-59.
JI Shoufeng, LAN Haiyan, TANG Jinhuan, et al. Manufacturers of productioninventory control strategy under carbon capandtrade mechanism[J]. Operations Research and Management Science, 2015(3): 51-59.
[13]KALCHSCHMIDT M, ZOTTERI G, VERGANTI R. Inventory management in a multiechelon spare parts supply chain[J]. International Journal of Production Economics, 2003,81/82:397-413.
[14]PAL B, SANA S S, CHAUDHURI K. A multi-echelon supply chain model for reworkable items in multiple-markets with supply disruption[J]. Economic Modelling, 2012, 29(5):1891-1898.
[15]SAJADIEH M S, FALLAHNEZHAD M, KHOSRAVI M. A joint optimal policy for a multiplesuppliers multiplemanufacturers multipleretailers system[J]. International Journal of Production Economics, 2013, 146(2): 738-744.
[16]ZAVANELLA L, ZANONI S. A one-vendor multi-buyer integrated production-inventory model: the ‘consignment stock’ case[J]. International Journal of Production Economics, 2009,118(1): 225-232.
[17]PARK S, LEE T E, SUNG C S. A threelevel supply chain network design model with riskpooling and lead times[J]. Transportation Research Part E, 2010, 46(5): 563581.
[18]王圣东. 单供货商多销售商联合生产库存模型[J]. 系统工程学报, 2006, 21(1): 92-96.
WANG Shengdong. Production inventory models for a one-vendor multi-buyer integrated system[J]. Journal of Systems Engineering, 2006, 21(1): 9296.
[19]LI J X, CHU F, CHEN H X. Coordination of split deliveries in one-warehouse multi-retailer distribution systems[J]. Computers & Industrial Engineering, 2011(60): 291-301.
[20]TANCREZ J S, LANGE J C, SEMAL P. A locationinventory model for large three-level supply chains[J]. Transportation Research Part E, 2012, 48(2):485-502.
[21]JHA J K, SHANKER K. Single-vendor multi-buyer integrated production-inventory model with controllable lead time and service level constraints[J]. Applied Mathematical Modelling, 2013, 37(4):1753-1767.
[22]PAN F, NAGI R. Multi-echelon supply chain network design in agile manufacturing[J]. Omega, 2013, 41(6):969-983.
[23]JONRINALDI N, ZHANG D Z. An integrated production and inventory model for a whole manufacturing supply chain involving reverse logistics with finite horizon period[J]. Omega, 2013, 41(3): 598-620.
[24]GUO C, LI X P. A multi-echelon inventory system with supplier selection and order allocation under stochastic demand[J]. International Journal of Production Economics, 2014,151: 37-47.
[25]GUCHHAIT P, MAITI M K, MAITI M. Production-inventory models for a damageable item with variable demands and inventory costs in an imperfect production process[J]. International Journal of Production Economics, 2013, 144(1):180-188.
[26]李群霞, 张群. 考虑缺货和缺陷品的模糊生产库存模型的优化求解[J]. 系统工程理论与实践, 2011, 31(3): 480-487.
LI Qunxia, ZHANG Qun. Fuzzy optimization of a production inventory system with allowable shortages and defective items[J]. Systems EngineeringTheory & Practice, 2011, 31(3): 480-487.
[27]彭红军, 周梅华. 两级生产与需求不确定的供应链生产订购决策[J]. 系统工程学报, 2010, 25(5): 622-628.
PENG Hongjun, ZHOU Meihua. Production and ordering decision in supply chain with uncertainty in two-echelon yields and demand[J]. Journal of Systems Engineering, 2010, 25(5): 622-628.
[28]OMAR M, SARKER R, OTH-MAN W A M. A just-in-time three-level integrated manufacturing system for linearly time-varying demand process[J]. Applied Mathematical Modelling, 2013, 37(3):1275-1281.
[29]LAM S W, TANG L C. Multiobjective vendor allocation in multiechelon inventory systems: a spreadsheet model[J]. Journal of the Operational Research Society, 2006, 57(5):561-57
[30]卫忠, 徐晓飞, 战德臣,等. 协同供应链多级库存控制的多目标优化模型及其求解方法[J]. 自动化学报, 2007, 33(2): 181-187.
WEI Zhong, XU Xiaofei, ZHAN Dechen, et al. Multi objective optimization model for collaborative multiechelon inventory control in supply chain[J]. Acta Automatica Sinica, 2007, 33(2): 181-187.
[31]BENDAYA M, HARIGA M. Integrated single vendor single buyer model with stochastic demand and variable lead time[J]. International Journal of Production Economics, 2004, 92(1): 75-80.
[32]CARDENASBARRON L E, TENG J T, TREVINOGARZA G, et al. An improved algorithm and solution on an integrated production-inventory model in a three-layer supply chain[J]. International Journal of Production Economics, 2012, 136(2):384-388.
[33]RODRIGUEZ M A, VECCHIETTI A. Inventory and delivery optimization under seasonal demand in the supply chain[J]. Computers and Chemical Engineering, 2010, 34(10): 1705-1718.
[34]OSMAN H, DEMIRLI K. Economic lot and delivery scheduling problem for multi-stage supply chains[J]. International Journal of Production Economics, 2012, 136(2):275-286.
[35]SANA S S. A collaborating inventory model in a supply chain[J]. Economic Modelling, 2012, 29(5): 2016-2023.
[36]YU J C P, WEE H M, WANG K J. Supply chain partnership for three-echelon deteriorating inventory model[J]. Journal of Industrial and Management Optimization, 2008, 4(4): 827-842.
[37]LEE J H, MOON K. Coordinated inventory models with compensation policy in a three level supply chain[C]. ICCSA'06 Proceedings of the 2006 International Conference on Computational Science and Its Applications Volume Part III, Heidelberg: Springer-Verlag Berlin,2006.
[38]JABER M Y, OSMAN I H, GUIFFRIDA A L. Coordinating a three-level supply chain with price discounts, price dependent demand, and profit sharing[J]. International Journal of Integrated Supply Management, 2006, 2(1/2): 28-48.
[39]JABER M Y, GOYAL S K. Coordinating a three-level supply chain with multiple suppliers, a vendor and multiple buyers[J]. International Journal of Production Economics, 2008, 116(1): 95-103.
[40]EFENDIGIL T, NT S. An integration methodology based on fuzzy inference systems and neural approaches for multi-stage supply-chains[J]. Computers & Industrial Engineering, 2012, 62(2):554-569.
[41]PAUL S K, SARKER R, ESSAM D. Real time disruption management for a two-stage batch production-inventory system with reliability considerations[J]. European Journal of Operational Research, 2014, 237(1): 113-128.
[42]DETTENBACH M, THONEMANN U W. The value of real time yield information in multistage inventory systems-exact and heuristic approaches[J]. European Journal of Operational Research, 2015, 240(1): 72-83.
[43]WANG K J, LIN Y S, YU J C P. Optimizing inventory policy for products with time-sensitive deteriorating rates in a multi-echelon supply chain[J]. International Journal of Production Economics, 2011, 130(1):66-76.
[44]HE Y, ZHAO X. Coordination in multiechelon supply chain under supply and demand uncertainty[J]. International Journal of Production Economics, 2012, 139(1):106-115.
[45]SANA S S. A productioninventory model of imperfect quality products in a threelayer supply chain[J]. Decision Support Systems, 2011, 50(2): 539-547.
[46]PAL B, SANA S S, CHAUDHURI K. Threelayer supply chain-a production-inventory model for reworkable items[J]. Applied Mathematics and Computation, 2012,219(2):530-543.
[47]SEIFERT R W, ZEQUEIRA R I, LIAO S Q. A threeechelon supply chain with price-only contracts and subsupply chain coordination[J]. International Journal of Production Economics, 2012, 138(2):345-353.
[48]SHI J M, ZHANG G Q, SHA J C. Optimal production planning for a multi-product closed loop system with uncertain demand and return[J]. Computers & Operations Research, 2011, 38(3): 641-650.
[49]ROY A, SANA S S, CHAUDHURI K. Optimal replenishment order for uncertain demand in three layer supply chain[J]. Economic Modelling, 2012, 29(6):2274-2282.
[50]侯玉梅. 简单生产-库存系统的优化控制[J]. 系统工程理论与实践, 2003(4): 1-6.
HOU Yumei. The optimal control of a simple inventoryproduction system[J]. Systems EngineeringTheory & Practice, 2003(4): 1-6.
[51]MUHARREMOGLU A, TSITSIKLIS J N. A single-unit decomposition approach to multiechelon inventory systems[J]. Operations Research, 2008, 56(6):1089-1103.
[52]GUERRERO W J, YEUNG T G, GURET C. Joint-optimization of inventory policies on a multi-product multi-echelon pharmaceutical system with batching and ordering constraints[J]. European Journal of Operational Research, 2013, 231(1): 98-108.
[53]TAI A H, CHING W K. Optimal inventory policy for a Markovian two-echelon system with returns and lateral transshipment[J]. International Journal of Production Economics, 2014, 151: 48-55.
[54]KOVACS A, EGRI P, KIS T, et al. Inventory control in supply chains: alternative approaches to a twostage lotsizing problem[J]. International Journal of Production Economics, 2013, 143(2): 385-394. |