Abstract:
For the manufacturing and distribution problem of fast moving consumer goods with fuzzy demands, a fuzzy linear programming model is presented. This model is capable solve multitime period, multiplant, multiproduct and multidistribution centers manufacturing and distribution integration problem. Considering inventory level in distribution centers, it minimizes the total manufacturing cost, inventory cost and distribution cost. A case study is used to demonstrate the feasibility of applying the proposed model.