column
    Mechanisms and Pathways of Generative Artificial Intelligence-Driven Productivity Transformation in Manufacturing: An Empirical Analysis of Guangdong Province
    LI Zhi, HU Henan
    2025, 28(2): 1-11. DOI: 10.3969/j.issn.1007-7375.250012
    Abstract PDF
    A Multi-objective Model for Coordinated Slot Reallocation with Curfew Constraints
    CHEN Kejia, CHEN Mengxi, GUO Xiaoqing
    2025, 28(2): 12-19. DOI: 10.3969/j.issn.1007-7375.240111
    Abstract PDF
    Multi-product Inventory Routing Optimization with Split Deliveries
    BIAN Zhan, ZHANG Qian
    2025, 28(2): 20-27. DOI: 10.3969/j.issn.1007-7375.240094
    Abstract PDF
    A Partitioning Method for Three-dimensional Integrated Circuits Based on Variable Neighborhood Search Algorithm
    YAO Shaowen, LI Rong, ZHANG Hao, LIU Qiang, WEI Lijun
    2025, 28(2): 28-36. DOI: 10.3969/j.issn.1007-7375.240085
    Abstract PDF
    Space Allocation for Intermodal Container Stacking Considering Stowing Planning
    TANG Luyao, LI Jun, ZHANG Kaixia, YAN Jingyu
    2025, 28(2): 37-46. DOI: 10.3969/j.issn.1007-7375.240046
    Abstract PDF
    Flexible Assembly Flowshop Scheduling with Batch Delivery Based on Analysis Target Cascading
    LIU Jianjun, LIAO Rongjie, LI Qinsong
    2025, 28(2): 47-57, 68. DOI: 10.3969/j.issn.1007-7375.240129
    Abstract PDF
    An Active Scheduling Method for Flexible Job Shops Considering Order Delivery Deadlines
    ZHU Haihua, TAO Shuai, WANG Jianjie, ZHANG Yi, TANG Dunbing, LIU Changchun
    2025, 28(2): 58-68. DOI: 10.3969/j.issn.1007-7375.240125
    Abstract PDF
    A Robust Scheduling Method for Aerospace Manufacturing Workshops with Production Disturbance
    GUO Jutao, DAI Zheng, ZHANG Jie, LYU Youlong, SUN Xiaofeng
    2025, 28(2): 69-77. DOI: 10.3969/j.issn.1007-7375.240134
    Abstract PDF
    An Online Scheduling Method for Hybrid Flow Shops with Batch Machines Based on Proximal Policy Optimization Algorithm
    LIU Zaiwei, WANG Mingwei, YUAN Yuan, LIU Qihao, LI Xinyu
    2025, 28(2): 78-90. DOI: 10.3969/j.issn.1007-7375.240122
    Abstract PDF
    Scheduling and Optimization of Semiconductor Manufacturing Systems with Residency Time Constraints and Wafer Cleaning
    LU Yanjun, LIU Zhaoting, QIAO Yulong, Pan Chunrong
    2025, 28(2): 91-97. DOI: 10.3969/j.issn.1007-7375.240101
    Abstract PDF
    Research on Parallel Machine Scheduling for Prefabricated Production Lines Considering Zero Buffer
    RUAN Wenxin, YU Miao, ZHANG Duo
    2025, 28(2): 98-109. DOI: 10.3969/j.issn.1007-7375.240133
    Abstract PDF
    Retailer Pricing and Ordering Decisions Considering Customer Returns and Resales
    LIANG Xi, SHI Mengyu
    2025, 28(2): 110-119, 140. DOI: 10.3969/j.issn.1007-7375.240163
    Abstract PDF
    Early Warning of Supply Chain Risks Based on RF-GA-BPNN Algorithm
    WANG Hongchun, ZHOU Zixiang
    2025, 28(2): 120-128. DOI: 10.3969/j.issn.1007-7375.240149
    Abstract PDF
    Low-Carbon Technology Investment and Cost-Sharing Decisions in a Retailer-Led Supply Chain under Different Game Mechanisms
    LIANG Kairong, HU Yujie, CHEN Liqiang, LI Kevin W.
    2025, 28(2): 129-140. DOI: 10.3969/j.issn.1007-7375.240194
    Abstract PDF
    Optimization of Multi-level Supply Chain Decisions in Manufacturing under Supply Chain Disruptions and Demand Uncertainty
    ZHAO Nan, FENG Chun
    2025, 28(2): 141-149. DOI: 10.3969/j.issn.1007-7375.240123
    Abstract PDF
    A Supply Chain Coordination Strategy Considering CSR with Dual Yield Uncertainties
    YANG Huaizhen, WEI Jinhao, FU Guilin, Qin Yujiang
    2025, 28(2): 150-159. DOI: 10.3969/j.issn.1007-7375.230038
    Abstract PDF
    Conceptual Design of Plant Layout
    KONG Fansen, LU Zhenlin, KONG Liang
    2025, 28(2): 160-170. DOI: 10.3969/j.issn.1007-7375.250006
    Abstract PDF