Liu Jun, Wang Xu-ming, Liu Ning, Sun Wen-hui. Decision-Making Model of Construction Material Procurement with Payment Delay[J]. Industrial Engineering Journal, 2013, 16(1): 50-53.
    Citation: Liu Jun, Wang Xu-ming, Liu Ning, Sun Wen-hui. Decision-Making Model of Construction Material Procurement with Payment Delay[J]. Industrial Engineering Journal, 2013, 16(1): 50-53.

    Decision-Making Model of Construction Material Procurement with Payment Delay

    • In the construction industry, to a contractor, the material suppliers provide payment delay service and discount for cash on delivery. To take this advantage, this paper explores the cost structure for construction material purchasing with different payment strategies. By modifying the existing purchase model used in the retail and manufacturing industries, the contractor’s payment strategy is analyzed when cash discount is adopted. Further, an optimum construction material purchasing decision model is put forward when payment delay is selected. An example is used to verify the feasibility of the proposed model.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return