考虑模糊工序工期的重复性项目时间费用权衡优化
邹鑫, 陈丹昊, 张立辉
Time-Cost Tradeoff Optimization for Scheduling Repetitive Projects with Fuzzy Activity Durations
ZOU Xin, CHEN Danhao, ZHANG Lihui
工业工程 . 2024, (4): 150 -160,170 .  DOI: 10.3969/j.issn.1007-7375.230104