物料齐套时间不确定的多地总装作业前摄性调度
李思瀚, 莫超雄, 刘建军, 陈庆新, 毛宁
Proactive Scheduling of Multi-location Final-assembly Operations with Uncertain Material Kitting Time
LI Sihan, MO Chaoxiong, LIU Jianjun, CHEN Qingxin, MAO Ning
工业工程
.
2021, (3): 104
-114
.
DOI: 10.3969/j.issn.1007-7375.2021.03.014