[1] 钟海. 大数据在工业制造业的应用与研究[J]. 企业技术开发:学术版, 2015, 34(5):104-105 ZHONG Hai. Application and research of big data in industrial manufacturing[J]. Technological Development of Enterprise, 2015, 34(5):104-105 [2] Liang Tienfu. Fuzzy multi-objective production/distribution planning decisions with multi-product and multi-time period in a supply chain[J]. Computers & Industrial Engineering, 2008, 55(3):676-94 [3] 唐加福, 汪定伟, 许宝栋. 多品种集约生产计划问题的模糊方法[J]. 管理科学学报, 2003, 6(1):44-50 TANG Jiafu, WANG Dingwei, XU Baodong. Fuzzy modeling approach to aggregate production planning with multi-product[J]. Journal of Management Sciences in China, 2003, 6(1):44-50 [4] ENTEZAMINIA, Arezoo, HEIDARI Mahdi, RAHMANI Donya. Robust aggregate production planning in a green supply chain under uncertainty considering reverse logistics:a case study[J]. International Journal of Advanced Manufacturing Technology, 2017, 90(5-8):1507-1528 [5] 徐学军, 顾培亮. 随机综合生产计划模型及其求解研究[J]. 工业工程, 2001, 4(3):12-15 XU Xuejun, GU Peiliang. Study on stochastic aggregate production planning models and solution procedure[J]. Industrial Engineering Journal, 2001, 4(3):12-15 [6] MULA J, POLER R, GARCIA-SABATER JP, et al. Models for production planning under uncertainty:a review[J]. International Journal of Production Economics, 2006, 103(1):271-285 [7] 彭锦, 刘宝碇. 不确定规划的研究现状及其发展前景[J]. 运筹与管理, 2002, 11(2):1-10 PENG Jin, LIU Baoding. Uncertain programming:current status and future prospects[J]. Operations Research and Management Science, 2002, 11(2):1-10 [8] 严洪森, 张晓东, 王浩. 满足产品需求条件下的车间最优随机生产计划与控制[J]. 中国机械工程, 200213(3):228-232 YAN Hongsen, ZHANG Xiaodong, WANG Hao. Optimal stochastic production planning and control for workshops with demand constraints[J]. China Mechanical Engineering, 200213(3):228-232 [9] Al-E-HASHEM S M J Mirzapour, BABOLI A, SAZVAR Z. A stochastic aggregate production planning model in a green supply chain:considering flexible lead times, nonlinear purchase and shortage cost functions[J]. European Journal of Operational Research, 2013, 230(1):26-41 [10] YAN H S. Hierarchical stochastic production planning with delay interaction[J]. Journal of Optimization Theory and Applications, 2000, 104(3):659-689 [11] 白进达, 曹喆, 张东凯, 等. 模糊批量生产计划问题的可信性规划模型与算法[J]. 模糊系统与数学, 2007, 21(2):113-120 BAI Jinda, CAO Zhe, ZHANG Dongkai, et al. Credibility programming approach to lot sizing production planning in fuzzy environment[J]. Fuzzy Systems and Mathematics, 2007, 21(2):113-120 [12] 唐加福, 董颖, 刘士新, 等. 模糊需求和模糊能力约束的集约生产计划[J]. 控制理论与应用, 2003, 20(6):894-896 TANG Jiafu, DONG Ying, LIU Shixin, et al. Aggregate production planning with fuzzy demands and fuzzy capacity[J]. Control theory & Applications, 2003, 20(6):894-896 [13] GUO Q Y. Two-stage fuzzy production planning expected value model and its approximation method[J]. Applied Mathematical Modelling, 2012, 36(6):2429-2445 [14] 葛健, 李燕风, 夏国平. 不确定环境下跨国供应链生产计划研究[J]. 计算机集成制造系统, 2005, 11(8):1120-1126 GE Jian, LI Yanfeng, XIA Guoping. Research on global supply chain production planning under uncertain environment[J]. Computer Integrated Manufacturing Systems, 2005, 11(8):1120-1126 [15] 姜潮. 基于区间的不确定性优化理论与算法[D]. 长沙:湖南大学, 2008 JIANG Chao. Theories and algorithms of uncertain optimization based on interval[D]. Changsha:Hunan University, 2008 [16] 邱涤珊, 贺川, 朱晓敏. 基于概率可信度的区间数排序方法[J]. 控制与决策, 2012, 27(12):1894-1898 QIU Dishan, HE Chuan, ZHU Xiaomin. Ranking method research of interval numbers based on probability reliability distribution[J]. Control and Decision, 2012, 27(12):1894-1898 [17] 肖峻, 张跃, 付川. 基于可能度的区间数排序方法比较[J]. 天津大学学报, 2011, 44(8):705-711 XIAO Jun, ZHANG Yue, FU Chuan. Comparison between methods of interval number ranking based on possibility[J]. Journal of Tianjin University, 2011, 44(8):705-711 [18] 张全, 樊治平, 潘德惠. 不确定性多属性决策中区间数的一种排序方法[J]. 系统工程理论与实践, 1999(5):129-133 ZHANG Quan, FAN Zhiping, PAN Dehui. A ranking approach for interval numbers in uncertain multiple attribute decision making problems[J]. Systems Engineering-Theory & Practice, 1999(5):129-133 [19] 达庆利, 刘新旺. 区间数线性规划及其满意解[J]. 系统工程理论与实践, 1999(4):3-7 DA Qingli, LIU Xinwang. Interval number linear programming and its satisfactory solution[J]. Systems Engineering-theory & Practice, 1999(4):3-7 [20] DUBIOS D, PARADE H. Ranking fuzzy numbers in the setting of possibility theory[J]. Information Sciences, 1983, 30(3):183-224 [21] JIANG C, HAN X, LIU G R. A nonlinear interval number programming method for uncertain optimization problems[J]. European Journal of Operational Research, 2008, 188(1):1-13 |