[1] 柴天佑. 工业过程控制系统研究现状与发展方向[J]. 中国科学: 信息科学, 2016, 46(8): 1003-1015 CHAI Tianyou. Industrial process control systems: research status and development direction[J]. SCIENTIA SINICA Informationis, 2016, 46(8): 1003-1015 [2] GB/T 8052-2002. 单水平和多水平计数连续抽样检验程序及表[S]. 北京: 中国标准出版社, 2002. [3] BOYLES R A. Process capability with asymmetric tolerances[J]. Communications in Statistics-Simulation and Computation, 1994, 23(3): 615-635 [4] PERAKIS M, XEKALAKI E. On the relationship between process capability indices and the proportion of conformance[J]. Quality Technology and Quantitative Management, 2016, 13(2): 1-14 [5] 彭苑茹, 刘勤明, 吕文元, 等. 基于故障状态演化的租赁设备定周期多维护策略研究[J]. 工业工程, 2018, 21(5): 61-67 PENG Yuanru, LIU Qinming, LYU Wenyuan, et al. A research on periodic multi-maintenance strategy of leased equipment based on failure state evolution[J]. Industrial Engineering Journal, 2018, 21(5): 61-67 [6] 陈洪根. 预防维修和VSS EWMA方差控制图联合经济决策模型[J]. 系统工程理论与实践, 2018, 38(5): 1236-1248 CHEN Honggen. Joint economic decision-making model of preventive maintenance and VSS EWMA variance control chart[J]. Systems Engineering - Theory & Practice, 2018, 38(5): 1236-1248 [7] 娄璐, 李艳婷. 面向未知自相关过程的Bootstrap控制图设计[J]. 工业工程, 2018, 21(4): 23-33 LOU Lu, LI Yanting. Bootstrap-based control chart design for unknown autocorrelated processes[J]. Industrial Engineering Journal, 2018, 21(4): 23-33 [8] CASSADY C R, MAILLART L M, REHMERT I J, et al. Demonstrating Deming's kp rule using an economic model of the CSP-1[J]. Quality Engineering, 2000, 12(3): 327-334 [9] HAJI A, HAJI R. The optimal policy for a sampling plan in continuous production in terms of the clearance number[J]. Computers & Industrial Engineering, 2004, 47(2): 141-147 [10] ELEFTHERIOU M, FARMAKIS N. Expected cost for continuous sampling plans[J]. Communication in Statistics - Theory and Methods, 2011, 40(16): 2969-2984 [11] BOUSLAH B, GHARBI A, PELLERIN R. Integrated production, sampling quality control and maintenance of deteriorating production systems with AOQL constraint[J]. Omega, 2016, 61(4): 110-126 [12] LI C Z, TONG S R, WANG K Q, et al. Optimal CSP-1 boundary scheme based on the estimator of the proportion of conformance for specified in control process[J]. Quality Technology and Quantitative Management, 2020, 17(1): 32-51 [13] WU C W, LIU S W. Developing a sampling plan by variables inspection for controlling lot fraction of defectives[J]. Applied Mathematical Modelling, 2014, 38(9-10): 2303-2310 [14] LEE J C, HUNG H N, PEARN W L, et al. On the distribution of the estimated process yield index Spk[J]. Quality and Reliability Engineering International, 2002, 18: 111-116 [15] PERAKIS M, XEKALAKI E. Assessing the proportion of conformance of a process from a bayesian perspective[J]. Quality and Reliability Engineering International, 2015, 31(3): 381-387 [16] 李春芝, 同淑荣, 王克勤. 面向稳态过程的基于合格品率估计的最优CSP-T边界方案[J]. 制造业自动化, 2018, 40(2): 5-10, 18 LI Chunzhi, TONG Shurong, WANG Keqin. Optimal CSP-T boundary scheme based on the estimator of the proportion of conformance for an in-control process[J]. Manufacturing Automation, 2018, 40(2): 5-10, 18
|