[1] SHEN J, AHMET J E, ROY R, et al. A framework for cost evaluation in product service system configuration[J]. International Journal of Production Research, 2017, 55(20): 6120-6144 [2] DAN B, GAO H, ZHANG Y, et al. Integrated order acceptance and scheduling decision making in product service supply chain with hard time windows constraints[J]. Journal of Industrial and Management Optimization, 2018, 14(1): 165-182 [3] XIE W, ZHAO Y X, JIANG Z B, et al. Optimizing product service system by franchise fee contracts under information asymmetry[J]. Annals of Operations Research, 2016, 240(2): 709-729 [4] LOCKETT H, JOHNSON M, EVANS S, et al. Product service systems and supply network relationships: an exploratory case study[J]. Journal of Manufacturing Technology Management, 2011, 22(3): 293-313 [5] ZHANG S, XU S, ZHANG W Y, et al. A hybrid approach combining an extended BBO algorithm with an intuitionistic fuzzy entropy weight method for QoS-aware manufacturing service supply chain optimization[J]. Neurocomputing, 2018, 272(10): 439-452 [6] JOHNSON M, MENA C. Supply chain management for servitised products: a multi-industry case study[J]. International Journal of Production Economics, 2008, 114(1): 27-39 [7] XU Z, MING X, SONG W, et al. Towards a new framework: understanding and managing the supply chain for product-service systems[J]. Proceedings of the Institution of Mechanical Engineers Part B:Journal of Engineering Mancfacture, 2017, 228(12): 1642-1652 [8] DAN B, LOU Y, HAN X P, et al. Pricing and coordination strategy in product-service supply chain with service demand affected by sales[J]. Journal of Systems & Management, 2017, 26(2): 381-389 [9] WANG Y, SUN L, QU R, et al. Price and service competition with maintenance service bundling[J]. Journal of Systems Science & Systems Engineering, 2015, 24(2): 168-169 [10] XIE W, JIANG Z, ZHAO Y, et al. Contract design for cooperative product service system with information asymmetry[J]. International Journal of Production Research, 2014, 52(6): 1658-1680 [11] 张旭梅, 冷金钟, 韩小鹏, 等. 售前服务影响产品需求下制造商与服务商的优化策略[J]. 系统工程, 2016, 34(1): 102-107 ZHANG Xumei, LENG Jinzhong, HAN Xiaopeng, et al. Optimization strategy between manufacturer and service providers under pre-sale service affecting product demand[J]. Systems Engineering, 2016, 34(1): 102-107 [12] VAN RYZIN G J. Analyzing inventory cost and service in supply chains[M]. Columbia: Columbia Business School, 2012. [13] SUN J, QU T, NIE D X, et al. Research on "Location-Inventory" problem of spare parts supply chain based on product service system[J]. Procedia CIRP, 2019, 83: 819-825 [14] CHEN M S, LIN C T. Effects of centralization on expected costs in a multilocation newsboy problem[J]. Journal of the Operational Research Society, 2000, 51(6): 755-761 [15] AXSATER S. Using the deterministic EOQ formula in stochastic inventory control[J]. Management Science, 1996, 42(6): 830-834 [16] CHRISTIANSEN S, PATRIKSSON M, WYNTER L. Stochastic bi-level programming in structural optimization[J]. Structural and Multidisciplinary Optimization, 2001, 21(5): 361-371 [17] HANSEN P, JAUMARD B, SAVARD G. New branch-and-bound rules for linear bi-level programming[J]. SIAM Journal on Scientific and Statistical Computing, 1992, 13(5): 1194-1217 [18] CANDLER W, TOWNSLEY R A. Linear two-level programming problem[J]. Computers & Operations Research, 1982, 9(1): 59-76 [19] BARD J F, FALK J. An explicit solution to the multi-level programming problem[J]. Computers & Operations Research, 1982, 9(1): 77-100
|