[1] 马东彦. 基于直送的两阶段混合调度模型的模拟退火算法研究[J]. 物流技术, 2009, 28(10): 48-50. MA Dongyan. Simulated annealing algorithm of two-stage hybrid scheduling model based on through transport [J]. Logistics Technology, 2009, 28(10): 48-50. [2] 邱晗光. 供应链协同供应配送策略研究[J]. 物流技术, 2013, 32(11): 336-338. QIU Hanguang. Study on supply chain joint supply and distribution strategy [J]. Logistics Technology, 2013, 32(11): 336-338. [3] LEE Y H, JUNG W J, LEE K M. Vehicle routing scheduling for cross-docking in the supply chain [J]. Computers & Industrial Engineering, 2006, 51(2): 247-256. [4] BERMAN Oded, QIAN Wang. Inbound logistic planning: minimizing transportation and inventory cost [J]. Transportation Science, 2006, 40(3): 287-299. [5] LIAO Ching-Jong, LIN Yaoming, SHIH S C. Vehicle routing with cross-docking in the supply chain [J]. Expert Systems with Applications, 2010, 37(10): 6868-6873. [6] 麦家骥, 陈峰. 基于循环取料的不确定越库调度模型与算法[J]. 上海交通大学学报, 2011, 45(2): 159-163. MAI Jiaji, CHEN Feng. Uncertain milk run-based cross docking scheduling: model and algorithms [J]. Journal of Shanghai Jiaotong University, 2011, 45(2): 159-163. [7] MIAO Zhaowei, YANG Feng, FU Ke, et al. Transshipment service through crossdocks with both soft and hard time windows[J]. Annals of operations research, 2012, 192(1): 21-47. [8] DONDO R, CERDÁ J. A monolithic approach to vehicle routing and operations scheduling of a cross-dock system with multiple dock doors [J]. Computers & Chemical Engineering, 2014, 63: 184-205. [9] SADJADI S J, JAFARI M, AMINI T. A new mathematical modeling and a genetic algorithm search for milk run problem (an auto industry supply chain case study) [J]. The International Journal of Advanced Manufacturing Technology, 2009, 44(1/2): 194-200. [10] 汪金莲, 蒋祖华. 汽车制造厂零部件入厂物流的循环取货路径规划[J]. 上海交通大学学报, 2009, 43(11): 1703-1708. WANG Jinlian, JIANG Zuhua. Routing for the Milk-Run Pickup System in Automobile Parts Supply [J]. Journal of Shanghai Jiaotong University, 2009, 43(11): 1703-1708. [11] GURINDER Singh Brar, GAGAN Saini. Milk run logistics: literature review and directions [C]//Proceedings of the World Congress on Engineering. 2011, 1: 6-8. [12] JAFARI-ESKANDARI M, ALIAHMADi A R, KHALEGHI G H H. A robust optimization approach for the milk run problem with time windows with inventory uncertainty: an auto industry supply chain case study [J]. International Journal of Rapid Manufacturing, 2010, 1(3): 334-347. [13] 章勋宏, 贾国柱, 孔继利. 考虑零件三维装载约束带时间窗的循环取货路径问题研究[J]. 管理工程学报, 2014, 28(4): 207-218. ZHANG Xunhong, JIA Guozhu, KONG Jili. Vehicle routing problem with time windows under three-dimensional loading constraint based on milk-run [J]. Journal of Industrial Engineering /Engineering Management, 2014, 28(4): 207-218. [14] 朱伟军, 屈挺, 王宗忠, 等. 工业园区集配中心循环取货路径规划[J]. 现代制造工程, 2015 (9): 13-19. ZHU Weijun, QU Ting, WANG Zongzhong, et al. Milk run route planning for supply hub in industrial park [J]. Modern Manufacturing Engineering, 2015 (9): 13-19. [15] TOSHINORI Nemoto, KATSUHIKO Hayashi, MASATAKA Hashimoto. Milk-run logistics by Japanese automobile manufacturers in Thailand [J]. Procedia-Social and Behavioral Sciences, 2010, 2(3): 5980-5989. [16] 邓爱民, 毛超, 周彦霆. 带软时间窗的集配货一体化VRP改进模拟退火算法优化研究[J]. 系统工程理论与实践, 2009, 29(5): 186-192. DENG Aimin, MAO Chao, ZHOU Yanting. Optimizing research of an improved simulated annealing algorithm to soft time windows vehicle routing problem with pick-up and delivery [J]. Systems Engineering--Theory & Practice, 2009, 29(5): 186-192. [17] 郎茂祥. 配送车辆优化调度模型与算法[M]. 北京: 电子工业出版社, 2009. |