[1]荆林波.质疑外包服务降低成本及引起失业的假说-以信息技术外包服务为例[J].经济研究,2005,40(1):117-123.
Jing Lin-bo. Outsourcing “cost savings assumption” and unemployed dilemma[J].Economic Research journal,2005,40(1):117-123.
[2]Kotabe M, Mol M J, Murray J Y.Outsourcing, performance, and the role of ecommerce: A dynamic perspective[J].Industrial Marketing Management, 2008,37(1):37-45.
[3]倪卫涛,周晶.MTO生产模式的交货期决策模型及其分析[J].工业工程,2008,11(2):54-57.
Ni Wei-tao, Zhou Jing. Delivery time model and its analysis based on MTO manufacturing mode[J].Industrial Engineering Journal, 2008,11(2):54-57.
[4]Timothy L. Establishing delivery guarantee policies[J].European Journal of Operational Research, 2009, 196(3):959-967.
[5]Park C, Song J, Kim J-G, et a1.Delivery date decision support system for the large scale maketoorder manufacturing companies[J].Production Planning&Control,1999,10(10):585-597.
[6]Corti D, Pozzetti A, Zorzini M. A capacity driven approach to establish reliable due dates in a MTO environment[J].International Journal of Production Economics,2006,104 (2):536-554.
[7]Henrich P, Land M, Gaalman G. Exploring applicability of the workload control concept[J].International Journal of Production Economics,2004, 90(2):187-198.
[8]Charnsirisakskul K, Griffin P M, Keskinocak P. Order selection and scheduling with lead time flexibility[J].IIE Transactions, 2004, 36(7):697-707.
[9]Charnsirisakskul K, Grifin P M, Keskinocak P. Pricing and scheduling decisions with leadtime flexibility[J].European Journal of Operation Research,2006,171(1):153-169.
[10]Ray S Jewkes E M.Customer lead time management when both demand and price are lead time sensitive[J].European Journal of operational research, 2004, 153:769-781.
[11]Hill A V, Hays J M, Naveh E A.Model for optimal delivery time guarantees[J].Journal of Service Research,2000,2(3):254-260.
[12]Duenyas I. Single facility due date setting with multiple Customer classes[J].Management Science,1999,41(3):608-619.
[13]So Kut C, Song Jing-Sheng. Price, delivery time guarantees and capacity selection[J].European Journal of Operational Research,1998,94(3):28-49.
[14]Wang D, Fang S C, Hodgson T J.A fuzzy due date bargainer for the maketoorder manufacturing systems[J]. IEEE Transactions on Systems, Man, and CyberneticsPart C, Application and Review,1998,28(3):492-497.
[15]Elhafsi M, Rolland E. Negotiating price delivery date in a stochastic manufacturing environment[J].IIE Transactions, 1999, 31(3): 255-270.
[16]Moodie D R. Demand management: The evaluation of price and due date negotiation strategies using simulation[J].Production and Operation Management, 1999, 8(2):151-162.
[17]Cakravastia A, Nakamura N. Model for negotiating the price and due date for a single order with multiple suppliers in a maketoorder environment[J]. International Journal of Production Research, 2002, 40(14):3425-3440.
[18]Cakravastia A, Nakamura N. Integrated model for supplier selection and negotiation in a make to order environment[J].International Journal of Production Research,2004,42(21):457-474.
[19]祝勇,潘晓弘,王正肖.基于优先准则的电子电脑零部件订货交货期决策[J].计算机工程与应用,2010,46(5):10-12,39.
〖DW〗Zhu Yong, Pan Xiaohong, Wang Zhengxiao. Deliverydate decision of electronic products orders for multiple assembly lines based on priority rule[J]. Computer Engineering and Applications, 2010,46(5):10-12,39.
[20]杨文胜,徐滟,李莉.时间敏感需求下的交货期相关定价策略[J].预测,2005,24(4):70-73.
〖DW〗Yang Wensheng, Xu Yan, Li Li. Modeling lead timecontingent Pricing under Timesensitive Demand[J]. Forecasting, 2005,24(4):70-73.
[21]林泽安,陈庆新,毛宁,等.运用半Markov与能力验证的模具企业订单交货期设置[J].工业工程,2010,13(4):7480.
〖DW〗Lin Zean, Chen Qingxin, Mao Ning, et al. Reliable due date setting in mold manufacturing based on semimarkov process and capacity checking[J]. Industrial Engineering Journal, 2010,13(4):74-80.
[22]钟永佳.半导体制造业订单交货期预测的研究[D].同济大学,2008.
〖DW〗Zhong Yongjia. Study on due data prediction of orders about semiconductor manufacturing[D].Tongji University,2008.
[23]宋莉波,徐学军,查靓.MTO 背景下基于负荷控制的内生交货期设置方法[J].工业工程与管理,2010,15(5):51-54.
〖DW〗Song Libo, Xu Xuejun, Zha Jing. Internal due date assignment approach in an MTO environment based on workload control[J]. Industrial Engineering and Management,2010,15(5):51-54.
[24]方叶祥,李东波,朱柏青,等.不确定条件下双目标组批生产的交货期设置研究[J].数学的实践与认识,2012,19 (42):54-63.
〖DW〗Fang Yexiang, Li Dongbo, Zhu Baiqing, et al. Due date assignment with biobjective based on batch schedule under uncertain condition[J]. Mathematics in Practice and Theory, 2012,19 (42):54-63.
[25]胡盛强,张毕西,张湘伟.MTO生产模式的完工期预测及承诺交货期决策[J].工业工程,2012,15(3):122-129.
Hu Shengqiang,Zhang Bixi,Zhang Xiangwei. Order completion date estimation and due date decision under maketoorder mode[J]. Industrial Engineering Journal, 2012,15(3):122-129.
[26]彭爱明.基于预测性生产的交货准时率改进研究[D].上海交通大学,2010.
Peng Aiming. Research on improving ontime order fill rate based on forecasting production[D].Shanghai Jiao Tong University,2010. |