[1] LEE K J, LEE J K, CHOI S Y. A spatial scheduling system and its application to shipbuilding: DAS-CURVE[J]. Expert Systems with Applications, 1996, 10(3-4): 311-324 [2] LEE J K, LEE K J, PARK H K, et al. Developing scheduling systems for Daewoo shipbuilding: DAS project[J]. European Journal of Operational Research, 1997, 97(2): 380-395 [3] PARK K, LEE K, PARK S, et al. Modeling and solving the spatial block scheduling problem in a shipbuilding company[J]. Computers & Industrial Engineering, 1996, 30(3): 357-364 [4] CHO K K, CHUNG K H, PARK C, et al. A spatial scheduling system for block painting process in shipbuilding[J]. CIRP Annals-Manufacturing Technology, 2001, 50(1): 339-342 [5] PARK C, CHUNG K H, PARK J C, et al. A spatial scheduling application at the block paint shop in shipbuilding: the HYPOS project[J]. Production Planning & Control, 2002, 13(4): 342-354 [6] SHIN J G, KWON O H, RYU C. Heuristic and metaheuristic spatial planning of assembly blocks with process schedules in an assembly shop using differential evolution[J]. Production Planning & Control, 2008, 19(6): 605-615 [7] 郭美娜, 李波. 基于树搜索的一种动态空间调度方法[J]. 计算机工程与应用, 2007, 43(14): 180-184 GUO Meina, LI Bo. Dynamic spatial scheduling approach based on tree-search[J]. Computer Engineering and Applications, 2007, 43(14): 180-184 [8] 张志英, 马姗静. 基于综合分解策略的船体分段空间调度方法[J]. 机械工程学报, 2010, 46(22): 189-194 ZHANG Zhiying, MA Shanjing. Approach on block spatial scheduling in shipbuilding based on integrated decomposition method[J]. Journal of Mechanical Engineering, 2010, 46(22): 189-194 [9] 聂兰顺, 靳金涛, 战德臣, 等. 基于配置空间理论的启发式空间调度算法[J]. 计算机集成制造系统, 2013, 19(10): 2590-2598 NIE Lanshun, JIN Jintao, ZHAN Dechen, et al. Heuristic spatial scheduling algorithm based on configuration space theory[J]. Computer Integrated Manufacturing Systems, 2013, 19(10): 2590-2598 [10] RAJ P, SRIVASTAVA R K. Solving spatial scheduling problem: an analytical approach[C]. Proceedings of the 37th International Conference on Computers and Industrial Engineering. Washington DC:Institute of Electrical and Electrics Engineers Inc., 2007: 2002-2011. [11] RAJ P, SRIVASTAVA R K. Analytical and heuristic approaches for solving the spatial scheduling problem[C]. 2007 IEEE International Conference on Industrial Engineering and Electrical and Engineering Management. Singpore: Institute of Electrical and Electrics Engineers Inc., 2007: 1093-1097. [12] GARCIA C, RABADI G. Exact and approximate methods for parallel multiple-area spatial scheduling with release times[J]. OR Spectrum, 2013, 35(3): 639-657 [13] KWON B, LEE G M. Spatial scheduling for large assembly blocks in shipbuilding[J]. Computers & Industrial Engineering, 2015, 89: 203-212 [14] 张志英, 陈洁. 空间调度问题的非线性规划分析求解方法[J]. 计算机集成制造系统, 2010, 16(6): 1272-1278 ZHANG Zhiying, CHEN Jie. Nonlinear programming approach for spatial scheduling problem[J]. Computer Integrated Manufacturing Systems, 2010, 16(6): 1272-1278 [15] VARGHESE R, YOON D Y. Dynamic spatial block arrangement scheduling in shipbuilding industry using genetic algorithm[C]. INDIN'05. 2005 3rd IEEE International Conference on Industrial Informatics. Perth, WA, Austrilia: Institute of Electrical and Electrics Engineers Inc., 2005: 444-449. [16] KOH S, JANG J, KIM C, et al. GA-based spatial scheduling algorithm for mega-block assembly yard in shipbuilding company[C]. Proceedings of the 9th Asia Pacific Industrial Engineering & Management Systems Conference. Hanover, MD, USA: Informs, 2008. [17] HU S, LIU T J, WANG S, et al. A hybrid heuristic algorithm for ship block construction space scheduling problem[J]. Discrete Dynamics in Nature and Society, 2015, 7: 1-6 [18] 张志英, 杨克开, 于瑾维, 等. 改进粒子群算法的动态空间调度方法[J]. 哈尔滨工程大学学报, 2009, 30(12): 1344-1350 ZHANG Zhiying, YANG Kekai, YU Jinwei, et al. Dynamic spatial scheduling approach based on improved particle swarm optimization algorithm[J]. Journal of Harbin Engineering University, 2009, 30(12): 1344-1350 [19] 马少辉, 王景秋, 陆春霞, 等. 动态空间调度的混合遗传算法[J]. 运筹与管理, 2013, 22(2): 99-104 MA Shaohui, WANG Jingqiu, LU Chunxia, et al. A dynamic spatial scheduling approach based on hybrid genetic algorithm[J]. Operation Research and Management Science, 2013, 22(2): 99-104 [20] 马少辉, 陆春霞. 船体不规则分段的动态空间调度算法[J]. 运筹与管理, 2014, 23(6): 281-287 MA Shaohui, LU Chunxia. A dynamic spatial scheduling algorithm for irregular blocks in shipbuilding[J]. Operation Research and Management Science, 2014, 23(6): 281-287 [21] 王东军, 刘翱, 刘克, 等. 基于优先规则的复杂并行机调度问题研究[J]. 系统工程理论与实践, 2016, 36(3): 779-786 WANG Dongjun, LIU Ao, LIU Ke, et al. Priority rule-based complex identical parallel machines scheduling[J]. Systems Engineering—Theory & Practice, 2016, 36(3): 779-786 [22] 刘振元, 王红卫. 基于优先规则的活动成本目标资源受限工程调度[J]. 系统工程理论与实践, 2006, 26(9): 99-106 LIU Zhenyuan, WANG Hongwei. Priority-rule-based resource constrained project scheduling with the objective of minimizing activities’ cost[J]. Systems Engineering—Theory & Practice, 2006, 26(9): 99-106 [23] 张松, 陈华平, 刘建. 复杂时间约束的水利工程项目调度问题研究[J]. 系统工程学报, 2016, 31(1): 135-144 ZHANG Song, CHEN Huaping, LIU Jian. Research on the complicated time-constrained project scheduling in water conservancy[J]. Journal of Systems Engineering, 2016, 31(1): 135-144 [24] 马英, 左春荣, 杨善林. 带不可用时间段和恶化加工时间的单机调度[J]. 系统工程学报, 2010, 25(3): 371-378 MA Ying, ZUO Chunrong, YANG Shanlin. Single machine scheduling with an availability constraint and deteriorating jobs[J]. Journal of Systems Engineering, 2010, 25(3): 371-378 [25] 王津剑, 杜吉旺, 范秀敏, 等. 复杂形状船舶分段建造空间调度优化算法[J]. 计算机集成制造系统, 2015, 21(11): 2945-2954 WANG Jinjian, DU Jiwang, FAN Xiumin, et al. Complex shape shipbuilding block spatial scheduling algorithm[J]. Computer Integrated Manufacturing Systems, 2015, 21(11): 2945-2954 [26] 张志英, 王蕾, 江志斌, 等. 面向船体曲面分段建造的空间调度方法[J]. 上海交通大学学报, 2008, 42(4): 569-573 ZHANG Zhiying, WANG Lei, JIANG Zhibin, et al. Spatial scheduling oriented to curved block in shipbuilding[J]. Journal of Shanghai Jiaotong University, 2008, 42(4): 569-573 [27] CHAZELLE B. The bottom-left bin-packing heuristic: an efficient implementation[J]. IEEE Transactions on Computers, 1983, C-32(8): 697-707 [28] HOPPER E, TURTON B C H. An empirical investigation of meta-heuristic and heuristic algorithms for a 2D packing problem[J]. European Journal of Operational Research, 2001, 128(1): 34-57
|