[1]韦尧兵,王睿超. 基于改进遗传算法的作业车问调度问题研究[J]. 科学技术与工程, 2009, 9(13): 1671-1819.
[2]Lee K J, Lee J K , Choi S Y. A spatial scheduling system and its application to shipbuilding: DASCURVE[J]. Expert Systems with Applications, 1996, 10(3/4): 311-324.
[3]Jakobs S. On genetic algorithms for the packing of polygons [J]. European Journal of Operational Research, 1996, 88(1): 165-181[4]Huang Wen-qi, Chen Duan-bing. An efficient heuristic algorithm for rectanglepacking problem[J]. Simulation Modeling Practice and Theory, 2007, 15(10): 1356-1365.
[5]Hopper E, Turton R. A genetic algorithms for a 2D industrial packing problem[J]. Computers in Engineering, 1999,37(1-2): 375-378.
[6]Alev Soke, Zafer Bingul. Hybrid genetic algorithm and simulated annealing for twodimensional non-guillotine rectangular packing problems[J]. Engineering Applications of Artificial Intelligence, 2006, 19(5): 557-567.
[7]Wei Lijun, Zhang Defu, Chen Qingshan. A least wasted first heuristic algorithm for the rectangular packing problem[J]. Computers & Operations Research , 2009,36(5): 1608-1614.
[8]Bennell J A, Dowsland K A, Dowsland W B. The irregular cuttingstock problema new procedure for deriving the no-fit polygon[J]. Computers and Operations Research, 2001, 28(3): 271-287.
[9]Gomes A M, Oliveira J F. A 2exchange heuristic for nesting problems[J]. European Journal of Operational Research,2002,141(2): 359-370.
[10]Liu Huyao, He Yuanjun. Algorithm for 2D irregularshaped nesting problem based on the NFP algorithm and lowestgravitycenter principle[J]. Journal of Zhejiang University 2006,7(4):570-576.
[11]Francis E H Tay, Chong T Y, Lee F C. Pattern nesting on irregular shaped stock using Genetic Algorithms[J]. Engineering Applications of Artificial Intelligence, 2002,15(6): 551-558.
[12]李波,王秀峰,赵志彦.一种基于遗传算法的最优空间布置方法[J].系统仿真学报,2004,16(8):1845-1848.
[13]Lee W C, Heng Ma, Cheng BorWen. A heuristic for nesting problems of irregular shapes[J]. ComputerAided Design, 2008, 40(5): 625-633.
[14]Lee J K, Lee K J, Park H K, et al. Developing scheduling systems for daewoo shipbuilding: DAS project[J]. European Journal of Operational Research,1997, 97(2): 311-324.
[15]Koh S H, Eom C H, Jang Jung hee. An improved spatial scheduling algorithm for block assembly shop in shipbuilding company[C]. The 3rd International Conference on Innovativ Computing Information and Control,Dalian:IEEI,2008, 253-253. |