[1]GOLDRATT E M, COX J, WHITFORD D. The goal: a process of ongoing improvement[M]. Great Barrington, MA: North River Press, 1992.
[2]周峰. DBR管理模式的生产计划与控制机制探讨[J]. 中国管理科学, 2000, 8(1): 17-21.
ZHOU Feng. Study on the production schedule and control mechanism in DBR[J]. Chinese Journal of Management Science, 2000, 8(1): 17-21.
[3]SCHRAGENHEIM E, RONEN B. Drumbufferrope shop floor control[J]. Production and Inventory Management Journal, 1990, 31(3): 18-22.
[4]SCHRAGENHEIM E, RONEN B. Buffermanagement: A diagnostic tool for production control[J]. Production and Inventory Management Journal,1991,32(2):74-79.
[5]郭永辉. DrumBufferRope 理论研究综述[J]. 工业工程与管理, 2008, 13(2): 1-4.
GUO Yonghui. Review on DrumBufferRope theory[J]. Industrial Engineering and Management, 2008, 13(2): 1-4.
[6]李爱华, 尹柳营. DBR 技术中确定缓冲大小的模型[J]. 中国管理科学, 1998, 6(1): 16-20.
LI Aihua, YIN Liuying. A model for determining the size of time buffers in DBR[J]. Chinese Journal of Management Science, 1998, 6(1): 16-20.
[7]WU H H, YEH M L. A DBR scheduling method for manufacturing environments with bottleneck reentrant flows[J]. International journal of production research, 2006, 44(5): 883-902.
[8]HUANG H H, PEI W, WU H H, et al. A research on problems of mixedline production and the rescheduling[J]. Robotics and ComputerIntegrated Manufacturing, 2013, 29(3): 64-72.
[9]杨琴, 周国华, 林晶晶, 等. 基于 DBR 理论的柔性流水车间动态调度[J]. 控制与决策, 2011, 26(7): 1109-1112.
YANG Qin, ZHOU Guohua, LIN Jingjing,et al. Dynamic scheduling of flexible flowshop problem based on DBR theory[J], Control and Decision, 2011, 26(7): 1109-1112.
[10]SIVASUBRAMANIAN R, SELLADURAI V, RAJAMRAMASAMY N. The effect of the drumbufferrope (DBR) approach on the performance of a synchronous manufacturing system (SMS)[J]. Production Planning & Control, 2000, 11(8): 820-824.
[11]RIEZEBOS J, KORTE G J, LAND M J. Improving a practical DBR buffering approach using Workload Control[J]. International Journal of Production Research, 2003, 41(4): 699-712.
[12]KLUSEWITZ G, RERICK R. Constraint management through the drumbufferrope system[J]. Advanced Semiconductor Manufacturing Conference & Workshop, 1996, 11(1):7-12.
[13]徐云天, 张力菠. 考虑系统波动因素的DBR瓶颈缓冲区容量设置[J]. 工业工程, 2014, 17(6):24-29.
XU Yuntian, ZHANG Libo. Determination of constraint buffer size for drumbufferrope considering system′s fluctuation factor[J]. Industrial Engineering Journal, 2014, 17(6):24-29.
[14]BECHTE W. Theory and practice of loadoriented manufacturing control[J]. The International Journal of Production Research, 1988, 26(3): 375-395.
[15]GUIDE V D, GHISELLI G A. Implementation of drumbufferrope at a military rework depot engine works[J]. Production and Inventory Management Journal, 1995, 36(1): 79-79.
[16]CHAKRAVORTY S S. An evaluation of the DBR control mechanism in a job shop environment[J]. Omega, 2001, 29(4): 335-342.
[17]YUAN K J, CHANG S H, LI R K. Enhancement of theory of constraints replenishment using a novel generic buffer management procedure[J]. International journal of production research, 2003, 41(4): 725-740.
[18]黄祥瑞. 可靠性工程[M].北京:清华大学出版社, 1990:15-16.
HUANG Xiangrui. Reliability engineering[M]. Beijing: Tsinghua University Press, 1990:15-16.
|