Production Logistics Synchronization Optimization Through ATO Pulling in Industrial Park

WU Qiang1, QU Ting1,2, YAN Zhijun1, ZHANG Ting1, HUANG Guoquan3   

  1. 1. Guangdong CIMS Provincial Key Lab, Guangdong University of Technology, Guangzhou 510006, China;
    2. College of Electrical and Informatics, Jinan University, Zhuhai 519070, China;
    3. Department of Industrial and Manufacturing Systems Engineering, The University of Hong Kong, Hong Kong, China
  • Received:2017-02-15 Online:2017-08-30 Published:2017-09-08

Abstract: To address problems induced by the assembly to order (ATO) production in industrial park, e.g. production logistics information synchronization and high operation cost, the "three-stage two-degree" production logistics synchronization (PLS) control mechanism was proposed based on Internet of Thing. Using simulation analysis of the cooperative optimization algorithm, it showed that 1) the earlier is the order dynamic, the more obvious is the benefit of synchronization control; 2) that the synchronization control across enterprises in industrial park can effectively help reduce logistics costs; and 3) that the later the dynamic happens and the bigger is the demand order, the more difficult the synchronization control will be, but its economic benefits will be better relative to un-synchronization.

Key words: production logistics, synchronization control, collaborative optimization(CO)