Proactive Scheduling of Multi-location Final-assembly Operations with Uncertain Material Kitting Time
LI Sihan, MO Chaoxiong, LIU Jianjun, CHEN Qingxin, MAO Ning
Industrial Engineering Journal . 2021, (3): 104 -114 .  DOI: 10.3969/j.issn.1007-7375.2021.03.014