[1] CHO K K, SUN J G, OH J S. An automated welding operation planning system for block assembly in shipbuilding[J]. International Journal of Production Economics, 1999, 60(1):203-209. [2] CHO K K, OH J S, RYU K R, et al. An integrated process planning and scheduling system for block assembly in shipbuilding[J]. CIRP Annals-Manufacturing Technology, 1998, 47(1):419-422. [3] GLEN J J. A dynamic programming model for work scheduling in a shipyard[J]. Operational Research Quarterly, 1975, 26(4):787-799. [4] LIU Z, CHUA D, WEE K H. A simulation model for spatial scheduling of dynamic block assembly in shipbuilding[J]. Journal of Engineering, Project and Production Management, 2011, 1(1):3-12. [5] BAO Jinsong, HU Xiaofeng, JIN Ye. A genetic algorithm for minimizing makes span of block erection in shipbuilding[J]. Journal of Manufacturing Technology Management, 2009, 20(4):500-512. [6] KIM H, KANG J, PARK S. Scheduling of shipyard block assembly process using constraint satisfaction problem[J]. Asia Pacific Management Review, 2002, 7(1):119-137. [7] KAJIWARA H, HITOI Y, HASSAN K. Max-plus approach to scheduling problems of block assembly lines[C/OL]. (2010-12-11). http://Proceedings of MARTEC 2010:the International Conference on Marine Technology. Dhaka, Bangladesh, 2010. [8] PINHA D C, QUEIROZ M H, CURY J E R. Optimal scheduling of a repair shipyard based on supervisory control theory[C/OL]. (2011-10-13). https://ieeexplore.ieee.org/document/6042515/. [9] JOO C M, KIM B S. Block transportation scheduling under delivery restriction in shipyard using meta-heuristic algorithms[J]. Expert Systems with Applications, 2014, 41(6):2851-2858. [10] DOHN A, CLAUSEN J. Optimizing the slab yard planning and crane scheduling problem using a two-stage heuristic[J]. International Journal of Production Research, 2010, 48(15):4585-4608. [11] DOHN A. Optimizing the steel plate storage yard crane scheduling problem using a two-stage planning/scheduling approach[C/OL]. (2007-01-20). http://icaps07-satellite.icaps-conference.org/dc/dc-07.pdf. [12] ZHONG Yuguang, XUE Kai, ZHAN Yong. Modeling and analysis of panel hull block assembly system through timed colored Petri net[J]. Marine Structures, 2011, 24(4):570-580. [13] CHA J H, ROH M I. Combined discrete event and discrete time simulation framework and its application to the block erection process in shipbuilding[J]. Advances in Engineering Software, 2010, 41(4):656-665. [14] ZHANG Z Y, CHEN J. Solving the spatial scheduling problem:a two-stage approach[J]. International Journal of Production Research, 2012, 50(10):2732-2743. [15] 刘建峰, 应长春. 船体分段制造日程计划的模拟与优化[J]. 中国造船, 2000, 41(4):13-21. LIU Jianfeng, YING Changchun. Simulation and optimization of the schedule plan for hull section manufacturing[J] Shipbuilding of China, 2000, 41(4):13-21. [16] 刘建峰. 基于PWBS船体建造运作策略研究[D]. 上海:上海交通大学, 2000. LIU Jianfeng, Research on the strategy of hull construction and operation based on PWBS[D]. Shanghai:Shanghai Jiao Tong University, 2000. [17] 赵明华, 蒋祖华. 针对异常的船体曲面分段作业计划自动调整算法[J]. 上海交通大学学报, 2010, 44(3):428-432. ZHAO Minghua, JIANG Zhuhua, Automatic adjustment algorithm for subsection operation planning for abnormal hull surface[J]. Journal of Shanghai Jiao Tong University, 2010, 44(3):428-432. [18] 赵明华. 面向船体曲面分段建造的空间调度及调整算法研究[D]. 上海:上海交通大学, 2010. ZHAO Minghua, Research on spatial scheduling and adjustment algorithm for segmented construction of hull surface[D]. Shanghai:Shanghai Jiao Tong University, 2000. |