[1] 刘亚飞, 刘晓婷, 宋效凯, 等. 多混凝土搅拌站协同供应模式及配送方案设计[J]. 混凝土, 2016(7): 127-129, 137 LIU Yafei, LIU Xiaoting, SONG Xiaokai, et al. Cooperative supply mode and distribution scheme designing of multiple concrete mixing station[J]. Concrete, 2016(7): 127-129, 137 [2] LIU Z, ZHANG Y, YU M, et al. Heuristic algorithm for ready-mixed concrete plant scheduling with multiple mixers[J]. Automation in Construction, 2017, 84: 1-13 [3] ZHANG G C, ZENG J C, ZHANG J H. Modelling and optimising of ready-mixed concrete vehicle scheduling problem with stochastic transportation time[J]. International Journal of Wireless and Mobile Computing, 2016, 10(2): 104-111 [4] YAN S, LIN H C. A planning model with a solution algorithm for ready mixed concrete production and truck dispatching under stochastic travel times[J]. Engineering Optimization, 2012, 44(4): 427-447 [5] DE MIRANDA SÁ J M, MAGHREBI M. A more realistic approach towards concrete delivery dispatching problem: using real distance instead spatial distance[J]. Australian Journal of Civil Engineering, 2018, 16(1): 1-11 [6] MOONS S, RAMAEKERS K, CARIS A, et al. Integrating production scheduling and vehicle routing decisions at the operational decision level: a review and discussion[J]. Computers & Industrial Engineering, 2017, 104: 224-245 [7] DEVAPRIYA P, FERRELL W, GEISMAR N. Integrated production and distribution scheduling with a perishable product[J]. European Journal of Operational Research, 2017, 259(3): 906-916 [8] SCHMID V, DOERNER K F, HARTL R F, et al. Hybridization of very large neighborhood search for ready-mixed concrete delivery problems[J]. Computers & Operations Research, 2010, 37(3): 559-574 [9] YAN S, WANG W C, CHANG G W, et al. Effective ready mixed concrete supply adjustments with inoperative mixers under stochastic travel times[J]. Transportation Letters, 2016, 8(5): 286-300 [10] ASBACH L, DORNDORF U, PESCH E. Analysis, modeling and solution of the concrete delivery problem[J]. European Journal of Operational Research, 2009, 193(3): 820-835 [11] ALBAYRAK G, ALBAYRAK U. Investigation of ready mixed concrete transportation problem using linear programming and genetic algorithm[J]. Civil Engineering Journal, 2016, 2(10): 491-496 [12] MAYTEEKRIEANGKRAI N, WONGTHATSANEKORN W. Optimized ready mixed concrete truck scheduling for uncertain factors using bee algorithm[J]. Songklanakarin Journal of Science and Technology, 2015, 37(2): 221-230 [13] CHOI J, JIA X, JEONG W. Optimizing the construction job site vehicle scheduling problem[J]. Sustainability, 2018, 10(5): 1381 [14] YAN S, LIN H C, LIU Y C. Optimal schedule adjustments for supplying ready mixed concrete following incidents[J]. Automation in Construction, 2011, 20(8): 1041-1050 [15] LIN P, WANG J, HUANG S, et al. Dispatching ready mixed concrete trucks under demand postponement and weight limit regulation[J]. Automation in Construction, 2010, 19(6): 798-807 [16] NASO D, SURICO M, TURCHIANO B, et al. Genetic algorithms for supply-chain scheduling: a case study in the distribution of ready-mixed concrete[J]. European Journal of Operational Research, 2007, 177(3): 2069-2099 [17] GRAHAM L D, FORBES D R, SMITH S D. Modeling the ready mixed concrete delivery system with neural networks[J]. Automation in Construction, 2006, 15(5): 656-663
|