[1] 兰爽, 李丹婷. 工作研究在定子装配线优化中的应用[J]. 工业工程, 2010, 13(3): 126-129. LAN Shuang, LI Danting. Application of work study to the redesign of a stator assembly line [J]. Industrial Engineering Journal, 2010, 13(3): 126-129. [2] 武超然, 李芳. 基于方法研究及仿真的汽车零部件流程优化[J]. 工业工程与管理, 2014, 19(5): 43-51. WU Chaoran, LI Fang. To improve and optimize business process based on methods study and witness simulation [J]. Industrial Engineering and Management, 2014, 19(5): 43-51. [3] 程晓娟, 曾德富, 全春光. 工作研究在某笔记本测试线效率提升中的应用[J]. 工业工程与管理, 2010, 15(1): 121-125. CHENG Xiaojuan, ZENG Defu, QUANG Chunguang. The application of work study in the efficiency improvement of laptop test Line [J]. Industrial Engineering and Management, 2010, 15(1): 121-125. [4] CARICATO P, GRIECO A. Using simulated annealing to design a material-handling system[J]. IEEE Intelligent Systems, 2005, 20(4): 26-30. [5] LIN J T, WANG F K, WU C K. Simulation analysis of the connecting transport AMHS in a wafer fab[J]. IEEE Transactions on Semiconductor Manufacturing, 2003, 16(3): 555-564. [6] WONG M M, TAN C H, ZHANG J B, et al. On-line reconfiguration to enhance the routing flexibility of complex automated material handling operations[J]. Robotics and Computer-Integrated Manufacturing, 2007, 23(3): 294-304. [7] 毛健, 乔金友, 王立军, 等. 基于Witness的汽车零部件生产物流系统仿真研究[J]. 工业工程, 2011, 14(3): 124-127. MAO Jian, QIAO Jinyou, WANG Lijun, et al. Simulation study on production flow in auto part manufacturing based on witness [J]. Industrial Engineering Journal, 2011, 14(3): 124-127. [8] 王建青, 邵延君, 刘永姜. 基于Flexsim的炼镁生产线仿真与优化[J]. 工业工程, 2009, 12(2): 78-81. WANG Jianqing, SHAO Yanjun, LIU Yongjiang. Simulation and optimization of magnesium smelting process based on Flexsim [J]. Industrial Engineering Journal, 2009, 12(2): 78-81. [9] 龚立雄, 谭国, 黄敏, 等. 基于Flexsim的摩托车涂装生产线仿真与优化研究[J]. 工业工程与管理, 2014, 19(3): 122-126. GONG Lixiong, TAN Guo, HUANG Min, et al. Simulation and optimization of motorcycle coating product line based on Flexsim [J]. Industrial Engineering and Management, 2014, 19(3): 122-126. [10] 兰秀菊, 陈勇, 汤洪涛. SMT生产线平衡的持续改善方析[J]. 工业工程与管理, 2006, 11(2): 109-111. LAN Xiuju, CHEN Yong, TANG Hongtao. Balancing and continuous improvement of SMT production line [J]. Industrial Engineering and Management, 2006, 11(2): 109-111. [11] 李钢, 安胜敏, 廖俊军. 汽车涂装生产线的优化与仿真[J]. 工业工程, 2008, 11(6): 71-75. LI Gang, AN Shengmin, LIAO Junjun. The optimization and simulation of automobile spread production line [J]. Industrial Engineering Journal, 2008, 11(6): 71-75. [12] 葛安华, 刘超, 孙晶. 基于市场需求变化的流水线最佳生产节拍选择[J]. 工业工程, 2011, 14(1): 96-100. GE Anhua, LIU Chao, SUN Jing. Market-demand adaptive method for best cycle time selection of production line [J]. Industrial Engineering Journal, 2011, 14(1): 96-100. [13] 曾敏刚, 李双. 电源适配器生产现场改善与装配线平衡[J]. 工业工程, 2010, 13(4): 117-123. ZENG Mingang, LI Shuang. Improvement of process and line balance in a power adapter assembly line [J]. Industrial Engineering Journal, 2010, 13(4): 117-123. [14] 陈勇, 汤科峰, 林飞龙, 等. 企业CD段流水线的瓶颈分析与平衡改善[J]. 工业工程与管理, 2008, 13(1): 112-115. CHEN Yong, TANG Kefeng, LIN Feilong, et al. The bottleneck analysis and balance improvement of flow line in the enterprise's CD section [J]. Industrial Engineering and Management, 2008, 13(1): 112-115. [15] 孙建华, 高广章, 蒋志强, 等. 程序分析法在产线平衡中的应用[J]. 机械设计与制造, 2005(5): 148-150. SUN Jianhua, GAO Guangzhang, JIANG Zhiqiang, et al. The application of program analysis method in streamline balance [J]. Machinery Design & Manufacture, 2005(5): 148-150. |