[1] 寿涌毅. 资源受限多项目调度的模型与方法[M]. 杭州:浙江大学出版社, 2010. [2] MOHRING R H, RADERMACHER F J, WEISS G. Stochastic scheduling problems I-General strategies[J]. Zeitschrift für Operations Research, 1984, 28(7):193-260. [3] MOHRING R H, RADERMACHER F J, WEISS G. Stochastic scheduling problems Ⅱ-Set strategies[J]. Zeitschrift für Operations Research, 1985, 29(3):65-104. [4] DEMEULEMEESTER E, HERROELEN W. Project scheduling:A research handbook[M], Kluwer Academic Publishers, 2002. [5] STORK F. Stochastic resource-constrained project scheduling[D]. Ph. D. thesis, Technische Universität Berlin, 2001. [6] BALLESTIN F, LEUS R. Resource-constrained project scheduling for timely project completion with stochastic activity durations[J]. Production and Operations Management, 2009, 18(4):459-474. [7] ASHTIANI B, LEUS R, ARYANEZHAD M B. New competitive results for the stochastic resource-constrained project scheduling problem:exploring the benefits of pre-processing[J]. Journal of Scheduling, 2001, 14(2):157-171. [8] LI Haitao, WOMER N K. Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming[J]. European Journal of Operational Research, 2015, 246(1):20-33. [9] GUTJAHR W J, STRAUSS C, WAGNER E. A stochastic branch-and-bound approach to activity crashing in project management[J]. ORSA Journal on Computing, 2000, 12(2):125-135. [10] ELMAGHRABY S E, MORGAN C D. Resource allocation in activity networks under stochastic conditions:A geometric programming-sample path optimization approach[J]. Review of Business and Economics Management, 2007, LⅡ(3):367-390. [11] GODINHO P, BRANCO F G. Discrete optimization:adaptive policies for multi-mode project scheduling under uncertainty[J]. European Journal of Operational Research, 2012, 216(3):553-563. [12] 李佳媛, 何正文. 基于资源随机中断的反应性多模式项目调度优化[J]. 运筹与管理, 2015, 24(6):44-50.LI Jiayuan, HE Zhengwen. Optimization of reactive multi-mode project scheduling based on stochastic breakdown of resources[J]. Operations Research and Management Science, 2015, 24(6):44-50. [13] 廖婷婷, 徐哲, 李明. 软件开发项目多技能人力资源均衡调度模型[J]. 工业工程, 2015, 18(3):69-74.LIAO Tingting, XU Zhe, LI Ming. A research on multi-skill human resource leveling scheduling model of software development project[J]. Industrial Engineering Journal, 2015, 18(3):69-74. [14] RIECK J, ZIMMERMANN J, GATHER T. Mixed-integer linear programming for resource leveling problems[J]. European Journal of Operational Research, 2012, 221(1):27-37. [15] 李明, 徐哲. 基于均衡优化的项目多技能人力资源指派与调度方法[J]. 工业工程, 2016, 19(1):108-114.LI Ming, XU Zhe. Methods of assigning multi-skilled human resources and scheduling projects based on resource leveling[J]. Industrial Engineering Journal, 2016, 19(1):108-114. [16] NEUMANN K, ZIMMERMANN J. Resource levelling for projects with schedule-dependent time windows[J]. European Journal of Operational Research, 1999, 117(3):591-605. [17] NEUMANN K, SCHWINDT C, ZIMMERMANN J. Project scheduling with time windows and scarce resources:temporal and resource-constrained project scheduling with regular and nonregular objective functions[M]. Springer, 2003. [18] BERTSEKAS D P, CASTANON D A. Rollout algorithms for stochastic scheduling problems[J]. Journal of Heuristics, 1999, 5(1):89-108. [19] HARTMANN S. Project scheduling with multiple modes:a genetic algorithm[J]. Annals of Operations Research. 2001, 102(1-4):111-135. [20] GOLDBERG D E, KORB B, DEB K. Messy genetic algorithms:motivation, analysis, and first results[J]. Complex Systems. 1989, 3(5):493-530. [21] BADIRU A B. A simulation approach to PERT network analysis[J]. Simulation. 1991, 57(4):245-255. [22] KOLISCH R, SPRECHER A. PSPLIB-A project scheduling problem library[J]. European Journal of Operational Research. 1997, 96(1):205-216. |