[1]张翠华,范岩,于海斌,等.分散决策供应链生产计划协同研究[J].计算机集成制造系统, 2008,14(8):1622-1629.
Zhang Cui-hua, Fan Yan, Yu Hai-bin, et al. Collaborative production planning in distributed decisionmaking supply chain[J]. Computer Integrated Manufacturing Systems, 2008,14(8):1622-1629.
[2]蔡政英,肖人彬,谭勇,等.不确定条件下循环供应链模糊自适应生产计划调度[J].控制与决策, 2008,23(5):525-529.
Cai Zheng-ying, Xiao Ren-bin, Tan Yong, et al. Fuzzy adaptive production plan dispatching of cycle supply chain under uncertainty conditions[J]. Control and Decision, 2008,23(5):525-529.
[3]杜少甫,梁樑.基于GBOM的供应链网络及其有生产能力约束的集成生产计划模型[J].管理学报,2006,3(2):143-147.
Du Shao-fu, Liang Liang. GBOMbased supply chain network and its integrated production planning model with capacity constraints[J]. Chinese Journal of Management,2006,3(2):143-147.
[4]方志梅,屠建飞,叶飞帆.虚拟企业ERP的结构与功能研究[J].计算机应用研究, 2006(1):90-92.
Fang Zhimei, Tu Jian-fei, Ye Fei-fan. Study on architecture and functions of virtual enterprise resource planning[J]. Application Research of Computers,2006(1):90-92.
[5]陈可嘉,叶舒婷.面向供应链的高级计划与排程的混合整数规划模型[J].中国机械工程,2012,23(14):16881692.
Chen Ke-jia Ye Shu-ting. A mixed integer programming model for advanced planning and scheduling in a supply chain[J]. China Mechanical Engineering,2012,23(14):1688-1692.
[6]Wang Y, Getchak Y. Capacity games in assembly systems with uncertain demand[J]. Manufacturing & Service Operations Management, 2003,5(3):252267.
[7]Lee Y H, Kim S H. Production distribution planning in supply chain considering capacity constraints[J]. Computers & Industrial Engineering, 2002,43(1-2):169-190. |