[1] KIRKAVAK N, DINÇER C. Performance evaluation models for single-item periodic pull production systems[J]. Journal of the Operational Research Society, 1996, 47(2):239-250. [2] TOPAN E, AVSAR Z M. An approximation for kanban controlled assembly systems[J]. Annals of Operations Research, 2011, 182(1):133-162. [3] AL-TAHAT M D, DALALAH D, BARGHASH M A. Dynamic programming model for multi-stage single-product Kanban-controlled serial production line[J]. Journal of Intelligent Manufacturing, 2012, 23(1):37-48. [4] 栗贺友, 郝建男. 看板管理在企业的应用[J]. 工业工程与管理, 2003, 8(2):62-66. LI Heyou, HAO Jiannan. Kanban administration in corporations[J]. Industrial Engineering and Management, 2003, 8(2):62-66. [5] 侯世旺, 朱慧明, 夏莉. 基于SimEvHOU Shiwang, ZHU Minghui, XIA Li. Design and analysis of Kanban production system based on SimEvent simulation[J]. Computer Integrated Manufacturing Systems, 2014, 20(10):2385-2394.t的多产品多阶段看板生产系统设计与分析[J]. 计算机集成制造系统, 2014, 20(10):2385-2394. HOU Shiwang, ZHU Minghui, XIA Li. Design and analysis of Kanban production system based on SimEvent simulation[J]. Computer Integrated Manufacturing Systems, 2014, 20(10):2385-2394. [6] SENGUPTA S, SHARIEF F, DUTTA S P. Determination of the optimal number of kanbans and kanban allocation in a FMS:A simulationbased study[J]. Production Planning & Control, 1999, 10(5):439-447. [7] WANG H, WANG H P. Determining the number of kanbans:A step toward non-stock-production[J]. International Journal of Production Research, 1990, 28(11):2101-2115. [8] CO H C, SHARAFALI M. Overlapping factor in Toyota's formula for computing the number of Kanbans[J]. IIE Transactions, 1997, 29(5):409-415. [9] 何桢, 周延虎, 高雪峰.管理中面向变异的看板(Kanban)系统研究[J]. 北京科技大学学报(社会科学版), 2007, 22(1):22-26. HE Zhen, ZHOU Yanhu, GAO Xuefeng. Study on kanban system with variations in management[J]. Journal of University of Science and Technology Beijing (Social Sciences Edition), 2007, 22(1):22-26. [10] YANG L, ZHANG X, JIANG M. An optimal Kanban system in a multi-stage, mixed-model assembly line[J]. Journal of Systems Science and Systems Engineering, 2010, 19(1):36-49. [11] FACCIO M, GAMBERI M, PERSONA A. Kanban number optimisation in a supermarket warehouse feeding a mixed-model assembly system[J]. International Journal of Production Research, 2013, 51(10):2997-3017. [12] SIVAKUMAR G D, SHAHABUDEEN P. Design of multi-stage adaptive kanban system[J]. The International Journal of Advanced Manufacturing Technology, 2008, 38(3-4):321-336. [13] AGHAJANI M, KERAMATI A, MOGHADAM R T, et al. A mathematical programming model for cellular manufacturing system controlled by kanban with rework consideration[J]. The International Journal of Advanced Manufacturing Technology, 2015, 83(5):1-18. [14] IANNONE R, MIRANDA S, RIEMMA S. The search for the optimal number of kanbans in unstable assembly-tree layout systems under intensive loading conditions[J]. International Journal of Computer Integrated Manufacturing, 2009, 22(4):315-324. [15] 潘全如, 朱翼隽. 排队论在收费站设计与管理中的应用[J]. 运筹学学报, 2009, 13(3):95-102. PAN Quanru, ZHU Yijun. The application of queuing theory in toll station design and management[J]. OR Transactions, 2009, 13(3):95-102. [16] 莫钒, 李娜, 于欣. 基于马尔科夫的医疗转诊策略研究[J]. 工业工程与管理, 2014, 19(5):140-146. MO Fan, LI Na, YU Xin. Healthcare referral strategy research based on Markov model[J]. Industrial Engineering and Management, 2014, 19(5):140-146. |