[1]Rohrbach A. Economical production of allmetal airplanes and seaplanes[J]. Journal ofthe Society of Automotive Engineers,1926, 20: 57-66.
[2]Wright T P. Factors affecting the cost of airplanes[J]. Journal of Aeronautical Sciences, 1936, 3(4): 122-128.
[3]Yelle L E. The learning curve: Historical review and comprehensive survey[J]. Decision Sciences,1979, 10(2): 302-328.
[4]Crossman E. A theory of the acquisition of speedskill?[J].Ergonomics, 1959, 2(2): 153-166.
[5]Levy F K. Adaptation in the production process[J]. Management Science, 1965, 11(6): B-136-B-154.
[6]Globerson S. The influence of job related variables on the predictability power of three learning curve models[J]. AIIE Transactions, 1980, 12(1): 64-69.
[7]Badiru A B. Computational survey of univariate and multivariate learning curve models[J]. Engineering Management, IEEE Transactions on, 1992, 39(2): 176-188.
[8]Franceschini F, Galetto M. Composition laws for learning curves of industrial manufacturing processes[J]. International journal of production research, 2003, 41(7): 1431-1447.
[9]Fine C H. Quality improvement and learning in productive systems[J]. Management Science, 1986, 32(10): 1301-1315.
[10]Jabber M Y, Guiffrida A L. Learning curves for imperfect production processes with reworks and process restoration interruptions[J]. European Journal of Operational Research, 2008, 189(1): 93-104.
[11]Ebert R J. Aggregate planning with learning curve productivity[J]. Management Science, 1976, 23(2): 171-182.
[12]Chand S, Sethi S P. A dynamic lot sizing model with learning in setups[J]. Operations Research, 1990, 38(4): 644-655.
[13]Hiller R S, Shapiro J F. Optimal capacity expansion planning when there are learning effects[J]. Management Science, 1986, 32(9): 1153-1163.
[14] Keachie E C, Fontana RJ. Effects of learning on optimal lot size[J]. Management Science, 1966, 13(2): B102-B108.
[15]Muth E J, Spremann K. Note—Learning Effects in Economic Lot Sizing[J]. Management Science, 1983, 29(2): 264-269.
[16]Pan J C H, Lo M C. The learning effect on setup cost reduction for mixture inventory models with variable lead time[J]. AsiaPacific journal of Operational Research, 2008, 25(4): 513-529.
[17]张毕西, 关迎莹, 宋静. 考虑学习率的人工作业系统批量加工模式优化[J]. 系统工程理论与实践, 2010, 30(4): 622-627.
Zhang Bi-xi, Guan Ying-ying, Song Jing. Optimization of batches processing modes for maunal operating system considering learning rate[J]. Systems Engineering Theory& Practice, 2010, 30(4): 622-627.
[18]Biskup D. Singlemachine scheduling with learning considerations[J]. European Journal of Operational Research, 1999, 115(1): 173-178.
[19]Cohen Y, Ezey Dar-El M. Optimizing the number of stations in assembly lines under learning for limited production[J]. Production Planning & Control, 1998, 9(3): 230-240.
[20] Anzanello M J, Fogliatto F S. Learning curve modeling of work assignment in mass customized assembly lines[J]. International Journal of Production Research, 2007, 25(4): 513-529.
[21]Mital A, Pennathur A, Huston R L, et al. The need for worker training in advanced manufacturing technology (AMT) environments: a white paper[J]. International Journal of Industrial Ergonomics, 1999, 24(2): 173-184.
[22]Warner R C, Needy K L, Bidanda B. Worker assignment in implementing manufacturing cells[J]. Proceedings of the IERC, 1997: 240-245.
[23]McDonald T, Ellis K, Van Aken E, et al.Development and application of a worker assignment model toevaluate a lean manufacturing cell[J].International Journal of Production Research, 2009, 47 (9): 2427-2447.
[24]Thompson G M, Goodale J C. Variable employee productivity in workforce scheduling[J]. European Journal of Operational Research, 2006, 170(2):376-390.
[25]Bokhorst J, Slomp J. Longterm allocation of operators to machines in manufacturing cells[C]∥Group technology/cellular manufacturing world symposium, San Juan, Puerto Rico. 2000: 153-158.
[26]Norman B A,Tharmmaphornphilas W, Needy K L, et al.Worker assignment in cellular manufacturing considering technical and human skills[J].International Journal of Production Research.2002,40 (6):1479-1492.
[27]Techawiboonwong A, Yenradee P, Das S K. A master scheduling model with skilled and unskilled temporary workers[J].International Journal of Production Economics, 2006,103(2):798-809.
|