[1] BLAZEWICZ J, LENSTRA J K, KAN A H G R. Scheduling subject to resource constraints:classification and complexity[J]. Discrete Applied Mathematics, 1983, 5(1):11-24 [2] ALVAREZ-VALDES R, TAMARIT J M. Heuristic algorithms for resource-constrained project scheduling:a review and an empirical analysis[J]. Advances in project scheduling, 1989,15(2):125-134 [3] KOLISCH R. Serial and parallel resource-constrained project scheduling methods revisited:theory and computation[J]. European Journal of Operational Research, 1996, 90(2):320-333 [4] KOLISCH R. Efficient priority rules for the resource-constrained project scheduling problem[J]. Journal of Operations Management, 1996, 14(3):179-192 [5] 张连营, 李彦伟, 孙若昕. 基于优先规则的模糊资源受限多项目调度[J]. 工业工程, 2014, 17(3):13-17 ZHANG Lianying, LI Yanwei, SUN Ruoxin. Fuzzy resource constrained multi-project scheduling based on precedence rules[J]. Industrial Engineering, 2014, 17(3):13-17 [6] WU M C, SUN S H. A project scheduling and staff assignment model considering learning effect[J]. The International Journal of Advanced Manufacturing Technology, 2006, 28(11):1190-1195 [7] 王一帆, 刘士新, 陈迪. 求解多技能人力资源约束的项目调度问题的两阶段算法[J]. 东北大学学报(自然科学版), 2014, 35(2):184-189 WANG Yifan, LIU Shixin, CHEN Di. The two stage algorithm for solving the project scheduling problem of multi-skilled human resource constraints[J]. Journal of Northeastern University(Natural Science Edition), 2014, 35(2):184-189 [8] GONÇALVES J F, MENDES J J M, RESENDE M G C. A genetic algorithm for the resource constrained multi-project scheduling problem[J]. European Journal of Operational Research, 2008, 189(3):1171-1190 [9] 王乐衡. 考虑多元设备类型的超启发式跨单元调度方法[D]. 北京:北京理工大学, 2015 WANG Leheng. Hyper-heuristic method cross unit scheduling considering multiple device types[D]. Beijing:Beijing Institute of Technology, 2015 [10] 付芳, 周泓. 多项目人力资源调度实证研究[J]. 管理工程学报, 2011, 25(3):73-77 FU Fang, ZHOU Hong. An empirical study on multi-project human resource scheduling[J]. Journal of Management Engineering, 2011, 25(3):73-77 [11] ANAGNOSTOPOULOS K P, KOULINAS G K. A genetic hyperheuristic algorithm for the resource constrained project scheduling problem[C/OL].(2010-07-18). https://ieeexplore.ieee.org/document/55864881 [12] KOULINAS G, KOTSIKAS L, ANAGNOSTOPOULOS K. A particle swarm optimization based hyper-heuristic algorithm for the classic resource constrained project scheduling problem[J]. Information Sciences, 2014, 277(2):680-693 [13] PONSTEEN A, KUSTERS R J. Classification of human- and automated resource allocation approaches in multi-project management[J]. Procedia - Social and Behavioral Sciences, 2015, 194:165-173 [14] BHASKAR T, PAL M N, PAL A K. A heuristic method for RCPSP with fuzzy activity times[J]. European Journal of Operational Research, 2011, 208(1):57-66 [15] KOLISCH R, SPRECHER A, DREXL A. Characterization and generation of a general class of resource-constrained project scheduling problems[J]. Management Science, 1995, 41(10):1693-1703 |