[1] DANESHAMOOZ F, FATTAHI P, HOSSEINI S M H. Mathematical modeling and two efficient branch and bound algorithms for job shop scheduling problem followed by an assembly stage[J]. Kybernetes: The International Journal of Systems & Cybernetics, 2021, 50(12): 3222-3245. [2] LEI D, CAI J. Multi-population meta-heuristics for production scheduling: A survey[J]. Swarm and Evolutionary Computation, 2020, 58: 100739 [3] WU C, GUPTA J N D, CHENG S, et al. Robust scheduling for a two-stage assembly shop with scenario-dependent processing times[J]. International Journal of Production Research, 2020, 59(2): 1-16. [4] WU C, BAI D, AZZOUZ A, et al. A branch-and-bound algorithm and four metaheuristics for minimizing total completion time for a two-stage assembly flow-shop scheduling problem with learning consideration[J]. Engineering Optimization, 2020, 52(6): 1009-1036 [5] YANG M S, BA L, ZHENG H Y, et al. An integrated system for scheduling of processing and assembly operations with fuzzy operation time and fuzzy delivery time[J]. Advances in Production Engineering & Management, 2019, 14(3): 367-378 [6] TOMAšEVIć I, STOJANOVIć D, SLOVIć D, et al. Lean in High-Mix/Low-Volume industry: a systematic literature review[J]. Production Planning & Control, 2020, 32(9/12): 1004-1019. [7] THÜRER M, STEVENSON M, SILVA C, et al. Workload control and order release in two-level multi-stage job shops: an assessment by simulation[J]. International Journal of Production Research, 2013, 51(3): 869-882 [8] BERTRAND J W M, WAKKER A M V D. An investigation of order release and flow time allowance policies for assembly job shops[J]. Production Planning & Control, 2002, 13(7): 639-648 [9] STAUDACHER A P. ISTS: A new procedure for the integrated scheduling of multi-stage systems[J]. International Journal of Production Research, 2000, 38(11): 2489-2514 [10] NATARAJAN K, MOHANASUNDARAM K M, BABU B S, et al. Performance evaluation of priority dispatching rules in multi-level assembly job shops with jobs having weights for flowtime and tardiness[J]. The International Journal of Advanced Manufacturing Technology, 2007, 31(7): 751-761 [11] THÜRER M, STEVENSON M, PROTZMAN Ⅲ C. Card-based production control: a review of the control mechanisms underpinning Kanban, ConWIP, POLCA and COBACABANA systems[J]. Production Planning & Control, 2016, 27: 1143-1157. [12] BAGNI G, GODINHO FILHO M, THURER M, et al. Systematic review and discussion of production control systems that emerged between 1999 and 2018[J]. Production Planning & Control, 2021, 32(5/8): 511-525. [13] LAND M J. Cobacabana (control of balance by card-based navigation) : A card-based system for job shop control[J]. International Journal of Production Economics, 2009, 117(1): 97-103 [14] THÜRER M, FERNANDES N O, Stevenson M, et al. Centralised vs. decentralised control decision in card-based control systems: comparing kanban systems and COBACABANA[J]. International Journal of Production Research, 2019, 57(2): 322-337 [15] THÜRER M, STEVENSON M. Card-based delivery date promising in pure flow shops with order release control[J]. International Journal of Production Research, 2016, 54(22): 6798-6811 [16] WANITWATTANAKOSOl J, SEKHARI A, SOPADANG A, et al. Exploring applicability of COBACABANA in job shop environment [C]//17th International Conference on Industrial Engineering Theory, Applications and Practice (IJIE). Busan: IJIE-TAP, 2013: 596-602 [17] THÜRER M, LAND M J, STEVENSON M, et al. Card-based delivery date promising in high-variety manufacturing with order release control[J]. International Journal of Production Economics, 2016, 172: 19-30 [18] BRAGLIA M, MARRAZZINI L, PADELLINI L. COBACABANA: a real industrial application in a job shop system[J]. Production Planning & Control, 2022, 33(11): 1061-1077. [19] THÜRER M, LAND M J, STEVENSON M. Card-based workload control for job shops: Improving COBACABANA[J]. International Journal of Production Economics, 2014, 147: 180-188 [20] 廖志华, 刘建军, 陈庆新, 等。负荷型对偶单元授权卡片交叠循环系统性能仿真[J]. 工业工程, 2021, 24 (4) : 100-111. LIAO Zhihua, LIU Jianjun, CHEN Qingxin, et al. Performance simulation of load-based paired-cell overlapping loops of cards with authorization[J]. Industrial Engineering Journal, 2021, 24 (4) : 100-111. [21] LIU J, LAND M J, BOKHORST J A, et al. Improving coordination in assembly job shops: redesigning order release and dispatching[J]. Flexible Services and Manufacturing Journal, 2023, 35: 669-697.
|